What's Required in Honolulu

  • House and garage reroofs that leave the structure untouched need no permit.
  • Replacing or changing roof framing needs a building permit with plans.
  • DPP's chart routes townhome and apartment reroofs to an instant online permit; confirm whether your building is R-3.
  • Like-for-like repairs are exempt up to $10,000 in valuation in any 12-month period.
  • Exempt work must still meet Honolulu's building code and ordinances.
  • Solar panels need their own permit pulled by a licensed electrical contractor.

Do You Need a Permit to Replace a Roof in Honolulu?

Not on a typical house. Ordinance 23-13 (2023) rewrote the exemption list in ROH 18-3.1(b), and item 3 exempts reroofing work that will not adversely affect the structural components for Groups R-3 and U occupancies. R-3 covers buildings of up to two dwelling units; U is the utility group (garages, carports, sheds), a model-code definition. DPP's own exemption summary does not list reroofing; this is the ordinance text. Tearing off old shingles or metal and putting new roofing on the same framing needs no building permit. Adding siding to existing walls of a house is exempt on the same terms.

The exemption stops at the structure. If you replace rafters, trusses, beams or the roof's shape, you need a building permit. DPP's chart treats townhomes and apartments as a separate path: a reroof there qualifies for an instant permit. Confirm with DPP whether your townhome falls under the R-3 exemption. Like-for-like maintenance repairs are also exempt up to $10,000 in valuation in any 12-month period, as long as no electrical, plumbing or mechanical work is involved.

Honolulu Roof Work by Scenario

What you are doingCity filingRule
Reroof a house or garage, framing untouchedNo permitROH 18-3.1(b)(3), R-3 and U
Replace rafters, trusses or roof framingBuilding permit with plansStructural work is not exempt
Reroof a townhome or apartment buildingInstant online permitDPP chart: reroofing, commercial path; confirm R-3 status
Add solar panels while reroofingSeparate instant permitPV is on DPP's instant list
Small like-for-like roof repairNo permitUp to $10,000 a year
$15,000 structural roof repair$342 + $68.40 plan review$410.40 total
$30,000 townhome building reroof$622Instant permit, no plan review

Which Roofs Need an Instant Online Permit?

DPP's instant permit chart sends multi-family buildings (townhomes and apartments) and commercial buildings down a separate path: if the project is only reroofing, the property qualifies for an instant online permit, as long as it is not in a flood zone and has no advisory or warning. The value of work must be $75,000 or less, and the permit is issued in HNL Build at the end of the application and paid by card. Each scope of work needs its own permit, so solar panels go on a separate PV permit.

How Much Is a Roof Permit in Honolulu?

For a house reroof that leaves the framing alone, nothing. When a permit is needed, the fee follows the value of the work. From $1,000.01 to $20,000 the fee is $12 plus $2.20 per $100: a $15,000 structural repair costs 150 × $2.20 + $12 = $342, plus a plan review fee of 20% ($68.40) because structural work needs plans. From $20,000.01 to $50,000 the fee is $82 plus $18 per $1,000: a $30,000 townhome reroof on an instant permit costs 30 × $18 + $82 = $622, with no plan review fee.

What Still Applies Without a Permit?

DPP says exempt work must still meet the city's codes and ordinances. Honolulu enforces the 2018 International Building and Residential Codes with State and City amendments, effective August 9, 2024. DPP lets you verify a contractor's license on the DCCA website. If a permit is needed, a parcel with an older structure may be routed to State Historic Preservation review.

How to Get a Roof Replacement Permit in Honolulu

1

Decide if the structure changes

If only roofing materials on a house or garage are replaced, no permit is needed; framing work needs one.

2

Check the property

Look up flood zone, zoning and advisories on DPP's Property Search; they decide whether an instant permit is possible.

3

Check the contractor

DPP lets you verify a contractor's license on the DCCA website; do it before signing.

4

Apply in HNL Build if needed

File an instant online permit for a qualifying multi-family reroof, or a building permit with plans for structural work.

5

Inspect and close

Call for the inspections listed on the permit and make sure the inspector closes it.

Frequently Asked Questions

No, if the reroofing will not adversely affect the structural components. ROH 18-3.1(b), as amended by Ordinance 23-13, exempts that reroofing for Group R-3 homes and Group U buildings such as garages and carports. Replacing framing or changing the roof structure needs a building permit.
DPP's chart sends them to an instant permit: multi-family and commercial buildings qualify for an instant online permit when the project is only reroofing and the property is not in a flood zone and has no advisory. The value of work must be $75,000 or less. Confirm with DPP whether your townhome falls under the R-3 exemption.
A house reroof that is exempt costs nothing. When a permit is required, the fee follows the value of work: a $15,000 structural repair pays $342 plus $68.40 plan review, and a $30,000 instant reroof pays $622.
Yes for like-for-like maintenance repairs up to $10,000 in valuation in any 12-month period that do not involve electrical or plumbing work. Larger repairs or any change to the structure need a permit.
Yes. PV with or without a battery is its own item on DPP's instant online permit list, and DPP says each scope of work requires a separate permit. It is installed by a licensed electrical contractor.