What's Required in Honolulu
- Every new or enlarged deck needs a building permit with plans.
- Apply in HNL Build and upload plans to ePlans; paper plans are not accepted.
- If your deck counts as an addition or alteration to a house, complete CivCheck before applying (since September 1, 2026).
- Decks over 30 inches high, lanais and pergolas must stay out of required yards.
- Plan review fee is 20% of the permit fee, paid when plans are accepted.
- Deck wiring must be installed by a state-licensed electrical contractor.
- Only the contractor that signed the permit may call the inspector.
Do You Need a Permit for a Deck in Honolulu?
Yes. DPP's answer is short: per ROH Chapter 18 you will need a building permit for a deck. Honolulu has no size or height cutoff for decks the way many mainland cities do. ROH 18-3.1(a) requires a permit to erect, construct, enlarge, alter or repair any building or structure, and none of the exemptions in 18-3.1(b) covers a deck. Walkways and outside paving on private property are exempt unless on a street corner or in a flood zone, so a ground-level patio of pavers or concrete is usually not a deck for permit purposes.
A deck is not on DPP's list of jobs that qualify for an instant online permit, so it is a building permit with plans. You apply in HNL Build, upload plans to ePlans, and the plans are prescreened and routed to every agency that needs to review them. Since September 1, 2026, DPP requires eligible residential projects (new construction, additions and alterations of single-family, two-family and duplex homes, plus ADUs and ohana units) to pass its CivCheck pre-check before applying, so run it if your deck counts as an addition or alteration; fences, retaining walls, general electrical and plumbing work, solar and quick permits are excluded.
Honolulu Deck Permits by Scenario
| What you are doing | City filing | Rule |
|---|---|---|
| Any new deck attached to a house | Building permit with plans | DPP FAQ; ROH 18-3.1(a) |
| Freestanding deck in the backyard | Building permit with plans | No deck exemption in 18-3.1(b) |
| Ground-level pavers or concrete patio | Usually no permit | Walkways and paving on private property are exempt unless on a street corner or in a flood zone |
| Rebuilding a deck like-for-like | Permit unless a small repair | Repairs exempt to $10,000 a year |
| Roof over the deck (covered lanai) | Building permit with plans | Not allowed in required yards |
| $10,000 deck | $232 + $46.40 plan review | $278.40 total |
| $25,000 deck | $532 + $106.40 plan review | $638.40 total |
How Much Does a Deck Permit Cost in Honolulu?
Fees follow the value of the work. For $1,000.01 to $20,000 the permit fee is $12 plus $2.20 per $100; for $20,000.01 to $50,000 it is $82 plus $18 per $1,000. A $10,000 deck: 100 × $2.20 + $12 = $232. A $25,000 deck: 25 × $18 + $82 = $532. Because a deck needs plans, a plan review fee of 20% of the permit fee is due when the plans are accepted ($46.40 and $106.40). Checks only, payable to the City and County of Honolulu.
Where Can a Deck Go on My Lot?
Zoning still decides placement. House lots have required yards of 10 feet in front and 5 feet at the sides and rear. The Land Use Ordinance allows structures not more than 30 inches high in required yards, but exterior balconies, lanais, pergolas and covered passageways are not permitted there. So a low, open deck may reach into a side or rear yard (railings count toward the 30 inches), while a raised or roofed deck has to stay inside the buildable area. Lots in a special management area, flood zone or special district get extra review, and work there needs a licensed architect's or engineer's stamp.
Who Can Build It?
An owner can build a deck for their own home as an owner-builder under HRS 444-2.5, after registering for the exemption; deck lighting or outlets must be installed by a licensed electrician. If you sell or lease within one year of completion, the law presumes you built for sale, unless the permit's valuation was under $10,000. Contractors must hold a Hawaii license, and DPP says a general contractor is typically required when more than 2 specialty contractors are involved.
How to Get a Deck Permit in Honolulu
Check zoning and site limits
Use DPP's Property Search for zoning, flood zone and advisories, and place the deck to respect the required yards.
Prepare plans and run CivCheck
Draw plans to DPP's plan format checklist and complete the CivCheck pre-check if your project is eligible.
Apply in HNL Build
Submit the building permit application, then upload plans to ePlans and pay the plan review fee.
Answer review comments
Plans are prescreened and routed to each reviewing agency; correct and resubmit until all approve.
Get the permit and inspections
Pay the permit fee by check, build, call for inspections and have the inspector close the permit.