Detected changes
Newest first. Each row links to the official source and to the archived capture in which the change was first seen, and to the previous capture for comparison.
| Detected | What changed | Previous | New | Source & capture |
|---|---|---|---|---|
| 2026-09-30 | Page title | Building Permit Fee Schedule | dob | Building Permit Fee Schedule | DOB | Fee schedule source · capture 2026-09-30 · previous 2026-09-09 |
| 2026-09-30 | Page URL (after redirects) | https://dob.dc.gov/node/1620346 | https://dob.dc.gov/page/building-permit-fee-schedule-0 | Fee schedule source · capture 2026-09-30 · previous 2026-09-09 |
| 2026-09-30 | Page title | DC Construction Codes | dob | DC Construction Codes | DOB | Adopted codes source · capture 2026-09-30 · previous 2026-09-09 |
| 2026-09-30 | Page title | How to Get a Permit | dob | How to Get a Permit | DOB | Submittal requirements source · capture 2026-09-30 · previous 2026-09-09 |
Lower-confidence signals not shown as facts: 3 fee, 1 portal, 1 page · 3 items awaiting editorial review. Export: changes.csv · changes.json.
Current values on record
| Field | Value | Source | Last verified |
|---|---|---|---|
| Page title | DC Construction Codes | DOB | Adopted codes · source | 2026-10-07 · archived copy |
| Page URL (after redirects) | https://dob.dc.gov/page/dc-construction-codes | Adopted codes · source | 2026-10-07 · archived copy |
| Page title | Search - DCRegs | Fee schedule · source | 2026-10-08 · archived copy |
| Page title | Building Permit Fee Schedule | DOB | Fee schedule · source | 2026-10-07 · archived copy |
| Page URL (after redirects) | https://dcregs.dc.gov/Common/DCMR/SectionList.aspx?SectionNumber=12… | Fee schedule · source | 2026-10-08 · archived copy |
| Page URL (after redirects) | https://dob.dc.gov/page/building-permit-fee-schedule-0 | Fee schedule · source | 2026-10-07 · archived copy |
| Page title | How to Get a Permit | DOB | Submittal requirements · source | 2026-10-07 · archived copy |
| Page URL (after redirects) | https://dob.dc.gov/page/get-permit | Submittal requirements · source | 2026-10-07 · archived copy |
Export: facts.csv · facts.json. Permit costs and requirements by project type: Washington permit guide.
Tracked sources
| Type | Official page | Last captured | Status | Captures | Archive |
|---|---|---|---|---|---|
| Adopted codes | https://dob.dc.gov/page/dc-construction-codes | 2026-10-07 | captured | 6 | archived copy |
| Fee schedule | https://dob.dc.gov/node/1620346 | 2026-10-07 | captured | 6 | archived copy |
| Fee schedule | https://dcregs.dc.gov/Common/DCMR/SectionList.aspx?Sectio… | 2026-10-08 | captured | 39 | archived copy |
| Submittal requirements | https://dob.dc.gov/page/get-permit | 2026-10-07 | captured | 6 | archived copy |
"Blocked" means the jurisdiction's site refused our fetch from that network on the last attempt; the source is retried from a second network before it is marked unreachable. Capture log: snapshots.csv.