Notice of Commencement: A sworn document recorded with the county, required in some states such as Florida, that states a construction project is about to begin and identifies the owner, property, contractor and lender. It sets the lien timeline.
What It Is
A notice of commencement is a short form, signed by the owner and recorded with the county recorder or clerk, that tells the public work is starting. It lists the property, a description of the work, the owner, the contractor and any lender, and it states how long the notice stays valid. Contractors, suppliers and other lien claimants use it to know how and when to serve their own notices.
It is part of a state's lien law rather than the building code, so it exists only in some states.
Where it is required, it generally has to be recorded before work starts, and in Florida before the first inspection; permit offices that require it will want to see a copy of it with its recording stamp on file.
Why a Permit Office Mentions It
Florida is the best-known example. Florida's lien law requires a recorded notice of commencement for improvements above a small dollar threshold, and many county building departments will not conduct a first inspection or issue some permits until a copy is on file. Other states have their own versions under different names, or none at all.
Because the rule is set by state statute, the threshold and the exact form differ. Your permit checklist will say whether you need one.
A notice carries an expiration date. If the project drags on beyond it, an amended or extended notice can be needed, and your lender may want to be named on it.
What It Changes for You
If you are the owner, the notice helps protect you from paying twice: a contractor who does not pay a subcontractor can leave you facing a lien, and the notice sets the order and timing of lien notices. Recording is usually inexpensive, and a title company or contractor can prepare it.
Do not sign it carelessly. Check that the legal description, the contractor's details and the expiration are correct, and keep the recorded copy handy for inspections.
Contractors and suppliers who want lien rights file their own notices after they see yours. That is how the paper trail protects an owner who pays on time.
Where It Comes Up on This Site
You will see it on larger, contractor-built projects in lien-law states, such as roofs, additions and pools. See our roof replacement guide, pool permit guide and the application guide for the sequence of steps.
For small jobs below the state threshold, or in a state with no such requirement, no notice is needed. Roofs, additions and pools are the usual cases where it comes up. Your permit checklist or county clerk's office can confirm the form and whether your job is large enough to need it.