Framing Inspection: An inspection of the completed structural framing of floors, walls and roof, carried out after the frame is built and before insulation or finishes cover it. It confirms members, nailing and connections meet the plans and code.
What a Framing Inspection Is
The framing inspection happens when the structural frame is complete but still open to view. The inspector walks the walls, floors and roof, checks them against the approved plans and looks at the connections that hold the structure together. Once insulation and drywall go up, those details are hidden, which is why the city requires the visit while they are still visible.
It is usually scheduled after the rough-in inspection of the trades, or at the same time.
On a deck, it is the stage after the posts and footings pass and before the decking, stairs and guards are fixed. Hidden connections such as ledger fasteners and flashing are what the inspector wants to see.
What the Inspector Looks At
The checklist is long, but the main items are consistent. Inspectors look at the size and spacing of studs, joists and rafters, headers over openings, the connections between members, hold-downs and straps where required, fire blocking, and the way a deck or addition attaches to the house. Wall bracing, bolts at the foundation and stair framing are also common items.
For engineered parts, they check the installation against the drawings, and may ask for special inspection reports.
Common correction items include missing fire blocking, lumber that is under-sized for its span, missing connectors and wall bracing that does not match the plan. Plan time for a possible second visit.
How to Prepare
Have the approved plans and permit card on site, keep framing visible and accessible, and make sure the trades' rough-ins are complete if they are due at the same time. A failed framing inspection means corrections and a re-inspection, and in some cities a re-inspection fee, so check the work against the plans first.
Do not cover the frame until it has passed. Covering work too early can force you to tear out finishes.
Some cities fold the framing inspection into a combined rough inspection with the electrical, plumbing and mechanical trades. Your inspection list on the permit card shows how your city does it.
Where It Comes Up on This Site
Framing inspections matter on decks, additions, ADUs and structural remodels. See the how to pass a building inspection guide, the deck permit guide and the home addition guide for the full inspection sequence.
Not every project has one. Projects with no new framing, such as a fence, equipment swap or reroof without structural repairs, normally skip it entirely. Ask the city how far ahead to book, because popular inspection slots can fill days in advance.