By Right: What It Means on a Zoning Permit

A project that meets the rules is approved by staff, with no hearing and no vote.

Updated November 2026 Glossary Term

By Right: By right, or as of right, means a use or project that complies with the zoning rules must be approved by staff, without a public hearing, discretionary vote or special exception.

What By Right Means

A by-right project is one the zoning code allows outright. If your plans meet every listed standard, such as the setbacks, height, size and use for your zoning district, the city must approve it. Reviewers check the numbers; they do not weigh whether the neighbors like the idea.

That is the opposite of a discretionary approval, where a board or planning commission decides after a hearing and may refuse or attach conditions. The related concept of ministerial approval describes the same kind of no-judgment decision.

By Right vs. Conditional

A zoning code sorts uses into groups. Permitted uses are by right. Conditional or special uses need a hearing and the approval can carry conditions; see conditional use permit. Prohibited uses are refused unless a variance, rezoning or other exception applies.

The same project can be by right in one district and conditional in another, or by right in one city and not allowed in the next. That is why the phrase on a city page is worth reading closely. A code can also make something by right only if you meet stated standards, such as size caps or owner occupancy.

What It Changes for You

By right usually means a faster, more predictable path. There is no hearing date to wait for, no public notice to the neighbors and no risk that a board votes no on a project that meets the rules. You still need the building permit and any other required approvals.

Many state laws push cities toward by-right approval for accessory dwelling units, and a by-right rule also limits what a city may ask of you. The ADU research page reports that 22 of the 30 largest cities we cover allow an ADU by right, 3 only in some districts and 2 with major limits.

Where It Comes Up on This Site

By right appears most on the ADU permit pages and in the ADU rules by city comparison, and it applies to garage conversions and additions that meet district standards. Sheds, fences and decks are generally by right when they meet setback and height limits, while a few want a zoning filing even for those. When a city page says an ADU is allowed by right, it means staff can approve it over the counter once the standards are met, and the remaining questions are the size, the setbacks and the fees, which the research pages compare.

Frequently Asked Questions

No. By right only means the zoning code allows the use without a hearing or discretionary approval. You still need a building permit, plan review and inspections where the work requires them, and you must still meet each listed standard such as setbacks and height.
By right means your project already meets the rules, so approval follows. A variance is an exception for a project that does not meet a rule, granted after a hearing on the grounds of hardship. By right is faster and more certain.
In many places, yes, and several state laws require it, but not everywhere. The ADU research page records which of 30 cities allow one by right and which impose conditions or bar it. Even where allowed by right, size, owner-occupancy and design standards can apply.