Permit Required? Required
Typical Fee Range $200–$800 Includes general building review; trade permits carry separate flat fees.
Fee Method Valuation-based

What's Required in Virginia Beach

  • Permit required for structural work or system modifications.
  • Floor plan showing existing and proposed layout.
  • Electrical permit for GFCI protection and new circuits.
  • Plumbing permit for moving sinks or gas lines.
  • Mechanical permit if installing a new range hood vent.
  • Verification of smoke and CO detector compliance.

Do You Need a Permit to Remodel a Kitchen in Virginia Beach?

It depends on what you're changing, not on the word β€œremodel.” Virginia Beach lists kitchen remodels as permit-required work, and in practice the permit attaches to the plumbing, electrical, and structural scope β€” not to cosmetic swaps. Permit fees typically run $200–$800 (valuation-based), issued by the Planning & Community Development - Building Permits and Inspections. A remodel that moves the sink, adds circuits, relocates the range, or opens a wall is firmly in permit territory β€” and often means separate trade permits rather than one ticket.

Kitchen Work That Usually Doesn't Need a Permit

The cosmetic layer is generally yours to change freely: swapping cabinets in the same footprint, new countertops, flooring, backsplash, paint, and replacing appliances that use existing hookups. The moment the project touches what's behind the finishes β€” supply lines, drains, gas, new circuits, walls, or venting β€” it stops being cosmetic in the city's eyes. If your remodel straddles the line, describe the full scope to the Planning & Community Development - Building Permits and Inspections up front; retrofitting a permit onto half-finished work is the expensive path.

How to Get a Kitchen Remodel Permit in Virginia Beach

1

Step 1: Create Plans

Draft a scale floor plan of the new kitchen layout.

2

Step 2: Submit Portal

Apply for a 'Residential Alteration' permit via Accela.

3

Step 3: Trade Sub-permits

Contractors must pull individual permits for plumbing and electric.

4

Step 4: Rough Inspections

Verify wiring and piping before closing walls.

5

Step 5: Final Sign-off

Final inspection of all fixtures and safety systems.

Frequently Asked Questions

If no plumbing/electrical is moved, cosmetic swaps are exempt.
Yes, they must be pulled individually but are linked to the project.
Expect 10-14 business days for residential reviews.
Only if the work goes beyond cosmetic scope. Plumbing, electrical, or structural changes require permits in Virginia Beach; cabinet, countertop, and flooring swaps generally don't. Fees typically run $200–$800.