Permit Required?
Required
Typical Fee Range
$1,000–$3,500
Includes building, zoning, and environmental review fees.
Fee Method
Valuation-based
What's Required in Virginia Beach
- Building permit required for all secondary dwelling units.
- Must have independent cooking, sleeping, and sanitation facilities.
- Requires professional architectural plans including foundation.
- Must meet lot coverage and setback rules for the zoning district.
- Owner-occupancy of the property is a mandatory requirement.
- Must comply with CBPA impervious cover and buffer rules.
How to Get a ADU Permit in Virginia Beach
1
Step 1: Zoning Audit
Confirm an ADU is allowed on your lot via BPI Planning.
2
Step 2: Design Documents
Prepare detailed site plans and architectural drawings.
3
Step 3: Submit Portal
Apply for a New Accessory Structure permit via Accela.
4
Step 4: Multi-Agency Review
Checked by Building, Zoning, and Environmental departments.
5
Step 5: Inspections
Full series from footings to final occupancy sign-off.
Frequently Asked Questions
Yes, provided it meets all building and safety codes.
ADUs can often share meters with the main house.
Expect 6-8 weeks for a new detached ADU.