Permit Required?
Required
Typical Fee Range
$170–$170
Includes a $100 trade application fee and $70 inspection fee.
Fee Method
Flat fee
Apply Online
Apply at Planning and Development Services →
What's Required in El Paso
- Mechanical trade application fee of $100.
- Supplemental single-trade inspection fee of $70.
- Manual J load calculations required for new system sizing.
- Electrical permit mandatory for power connection to the unit.
- Exterior units must meet zoning setbacks.
- Proper venting and safety valves must be installed.
How to Get a HVAC Permit in El Paso
1
Step 1: Choose System
Ensure the HVAC unit is correctly sized for the property.
2
Step 2: Submit Application
Apply for the mechanical trade permit online.
3
Step 3: Pay Fees
Submit $100 for the trade app and $70 for inspection.
4
Step 4: Installation
Replace the unit according to mechanical code.
5
Step 5: Final Inspection
Verify venting and safety with a PDS inspector.
Frequently Asked Questions
The application fee for the mechanical trade is $100.
Yes, supplemental inspections for single trades are $70.
Trade work typically requires a licensed professional in El Paso.