Permit Required? Required
Typical Fee Range $150–$600 Includes general building review; trade permits carry separate fees.
Fee Method Valuation-based

What's Required in Albuquerque

  • Permit required for structural work or system modifications.
  • Scale drawings showing the new layout and fixture locations.
  • Electrical permit for GFCI protection and new circuits.
  • Plumbing permit for moving sinks or gas lines.
  • Mechanical permit if installing a new range hood vent.
  • Verification of current smoke and CO detector compliance.

How to Get a Kitchen Remodel Permit in Albuquerque

1

Step 1: Create Plans

Draft a floor plan of the existing and new kitchen layout.

2

Step 2: Submit Portal

Apply for a 'Residential Alteration' permit online.

3

Step 3: Trade Sub-permits

Contractors must pull individual permits for plumbing and electric.

4

Step 4: Rough Inspections

Verify wiring and piping before installing drywall/cabinets.

5

Step 5: Final Sign-off

Final inspection of all fixtures and safety systems.

Frequently Asked Questions

If no plumbing/electrical is moved, cosmetic swaps are exempt.
No, they must be pulled individually but are linked to the project.
Expect 10-14 business days for residential kitchen reviews.