What's Required in Wichita
- A building permit for kitchen work that changes walls, layout, plumbing, gas, wiring or ventilation.
- The job valuation on the residential building application, which MABCD may ask you to substantiate.
- Trade work covered by the building permit or, if started more than 180 days later, its own trade permit.
- Licensed electrical, plumbing and mechanical contractors unless the owner-occupant passed the homeowner exam for that trade.
- A homeowner declaration form if you act as your own contractor.
- The inspection record card posted on site before work starts.
Do I need a permit to remodel my kitchen in Wichita?
It depends on what you change. The Metropolitan Area Building and Construction Department (MABCD) says that if something was there before, you can repair or replace it without a permit when it is finish work: paint, wallpaper, tiling, carpeting, cabinets, countertops, paneling and similar. The local code adds floor covering to that list. New construction, additions and changes need a permit. In practice:
- New cabinets, counters, backsplash and flooring in the same layout: no permit.
- Moving or removing a wall, adding a window, relocating the sink or range, new circuits, a new gas line or a new range hood duct: permit required (ask MABCD if you only swap a hood with no new duct).
Drywall repair is exempt only up to 100 square feet in a 12-month period on non-fire-rated walls and ceilings, and only if no framing, electrical, mechanical or plumbing changes are made. MABCD's owner-occupant plumbing section (3.1.430) also says no permit is required for minor repairs or alterations priced at $200 or less; the work must still meet code. Ask MABCD whether this applies to contractor work.
How much is a kitchen remodel permit in Wichita?
Remodels, residential included, are priced on the Table B valuation schedule: $70 for the first $2,000 plus $11 per additional $1,000 up to $40,000, then $488 plus $9 per additional $1,000 up to $100,000. Fractions of $1,000 count as a full $1,000. Worked examples:
- A $25,000 kitchen: $70 + (23 × $11) = $323.
- A $60,000 kitchen: $488 + (20 × $9) = $668.
MABCD can ask you to substantiate the valuation. Table C also lists plan review at 60% of the building permit fee; MABCD's fee calculator labels that charge as commercial, and residential plans are reviewed at the counter with a permit writer, so ask whether it applies before you budget it. The Director may cut Table B fees by up to 20% for a period.
| What you are doing | City filing | Rule |
|---|---|---|
| New cabinets and counters, same layout | None | Finish work exempt |
| New flooring, tile, paint, backsplash | None | Finish work exempt |
| Drywall patch up to 100 sq ft, no trade changes | None | Exempt within 12 months |
| Remove or move a wall | Building permit | Valuation schedule |
| Relocate sink, add dishwasher drain or gas line | Covered by building permit | No separate plumbing permit in a one- or two-family remodel |
| Add circuits for appliances | Covered by building permit | Homeowner exam or licensed electrician |
| Trade work only, no building permit | Trade permit | Itemized fees plus $25 issuance |
Do I need separate electrical and plumbing permits?
Not for a one- or two-family house when the work is part of a remodel under a building permit: MABCD's trade fee tables say electrical, plumbing and mechanical work done with a residential remodel is covered by the building permit. You need a separate trade permit if that trade work starts more than 180 days after the building permit was issued, or if you are doing trade work alone. Standalone plumbing permits are itemized, for example $4.50 per waste opening plus a $25 issuance fee.
Can I do the work myself?
Only in a home you own and live in. You file a homeowner declaration, then either name a licensed subcontractor for each trade or schedule MABCD's homeowner exams before the permit issues: electrical ($50, 2023 NEC, includes a plan review) and plumbing ($25), each passed at 75%. If you skip that step at application, licensed trades must do the work. Owners who rent the home out must hire licensed contractors.
What if I skip the permit?
MABCD's fee Table G sets a civil penalty of twice the permit fee, capped at $5,000, for building work started without a permit in Wichita, and $150 for trade work. The residential code's own permit section says the penalty is up to the amount of the permit fee, so confirm the amount with MABCD.
How to Get a Kitchen Remodel Permit in Wichita
Define the scope
Same-layout finish work is exempt; anything that moves walls, plumbing, gas or wiring needs a permit.
Line up the trades
Name licensed subcontractors or schedule homeowner exams before applying.
Apply on the MABCD Portal
File a residential building application with the valuation, or book an appointment to review plans with a permit writer.
Pay the fee
Valuation schedule, for example $323 on a $25,000 job.
Call inspections
Schedule the inspections MABCD requires on the portal, through final. Keep the inspection record card on site.