Permit Required? Required
Typical Fee Range $300–$1,500 Building permit plus electrical and plumbing trade fees ($75 minimum per trade).
Fee Method Valuation-based

What's Required in Orlando

  • Building permit required for structural work or layout changes.
  • Electrical permit mandatory for new lighting, outlets, and appliances.
  • Plumbing permit required for moving sinks or gas lines.
  • Notice of Commencement required if project cost exceeds $2,500.
  • Scale drawings must be verified by a Florida registered architect/engineer.
  • GFCI protection required for all countertop receptacles.

How to Get a Kitchen Remodel Permit in Orlando

1

Step 1: Professional Design

Hire an architect/engineer for scale drawings.

2

Step 2: Submit Portal

Apply for Master Alteration and trade permits online.

3

Step 3: Record NOC

Record Notice of Commencement for projects over $2,500.

4

Step 4: Rough Inspections

Verify wiring and piping before closing walls.

5

Step 5: Final Check

Final inspection of all fixtures and safety features.

Frequently Asked Questions

Cosmetic changes like cabinets may be exempt if no plumbing/electrical is moved.
$75 for new construction or additions.
Yes, but you must sign an Owner/Builder declaration in person.