Permit Required?
Required
Typical Fee Range
$150–$250
Standard panel upgrades follow the $150 minimum permit fee for projects requiring inspections.
Fee Method
Valuation-based
What's Required in Jacksonville
- Electrical permit required for all panel replacements, relocations, or service upgrades.
- Work must be performed by a licensed Florida Electrical Contractor registered with the city.
- Panels must be installed in accessible locations per latest NEC code.
- Notice of Commencement required if project value exceeds $2,500.
- Utility 'Release' from the city is required before JEA can restore power.
- Smoke and Carbon Monoxide detectors must be brought to current code during any electrical project.
How to Get a Electrical Panel Permit in Jacksonville
1
Step 1: Licensed Contractor
Ensure your electrician is registered and active in JAXEPICS.
2
Step 2: Portal Application
Submit an 'Electrical Residential' permit application online.
3
Step 3: Record NOC
If project cost is >$2,500, record the NOC with Duval County.
4
Step 4: Fee Payment
Pay the valuation-based fee ($150 min) online through JAXEPICS.
5
Step 5: Inspection & JEA Release
Schedule inspection; passing will trigger an electronic release to JEA.
Frequently Asked Questions
Yes, an electrical permit is mandatory for any service upgrade or panel work.
Minimum fees start at $150 plus applicable administrative fees.
Yes, for their primary residence as an Owner-Builder, provided they do the work themselves.