What's Required in Irvine

  • Get a building permit for any interior remodel that alters walls, structure or layout.
  • Get electrical, plumbing or mechanical permits for new wiring, piping, gas outlets or ducts.
  • Stay within 10 electrical fixtures, 4 plumbing fixtures and 5 gas outlets to use the online combo permit.
  • Submit a Residential Remodel title sheet, site plan and floor plans through IrvineReady! for plan-check remodels.
  • Bring the home up to current smoke and carbon monoxide alarm requirements before final inspection.
  • Follow South Coast AQMD Rule 1403 for any asbestos disturbed during demolition.
  • Get HOA board written permission for condo work that affects a common area.

Do You Need a Permit to Remodel a Kitchen in Irvine?

It depends on the scope. Irvine requires a building permit for an interior remodel or alteration, and separate electrical, plumbing and mechanical permits for new wiring, piping and ducts. Some kitchen work needs nothing: the Permits Not Required list covers painting, papering and similar finish work, and no plumbing permit is needed to remove and reinstall or replace a sink, garbage disposal or dishwasher as long as the job does not involve replacing or rearranging valves, pipes or fixtures.

Between those two ends sits the city's small combination permit, which PermitsDIRECT!, the online portal for no-plan-check work, lists as Miscellaneous Residential Work. The city's minor-permit page sets its limits: no plans, up to 10 electrical fixtures and/or outlets, up to four (4) plumbing fixtures, one to five gas outlets, one sewer connection and up to five (5) grilles and ducting. A kitchen job that moves walls, changes structure or exceeds those counts goes through plan check on IrvineReady!. These conditions come from the city's pages for its older Automated Online Permit system, which PermitsDIRECT! replaced on September 14; confirm eligibility when you apply.

Irvine Kitchen Remodel Rules by Scenario

What you are doingCity filingRule
Paint, new cabinet doors or finish work onlyNonePainting, papering and similar finish work
Swap a sink, disposal or dishwasher in placeNoneNo plumbing permit if pipes and valves stay
New lighting and outlets, up to 10 fixturesSmall combo permit onlinePermitsDIRECT!, no plans
Move the sink or add a gas range outletSmall combo permit onlineUp to 4 plumbing fixtures, 1 to 5 gas outlets
Remove or move walls, or a full gut remodelRemodel permit with plansIrvineReady! plan check
Kitchen in a condo with shared wallsRemodel permit with stamped plansLicensed design professional must prepare them
Kitchen expanded into new floor areaAddition permitResidential Additions process

How Much Does a Kitchen Remodel Permit Cost in Irvine?

For a remodel with plans, Schedule II (effective August 15, 2026) item 7 charges plan check at $0.86 per square foot (minimum $95.67), which includes plumbing, electrical and mechanical, plus $398.39 inspection for each residential kitchen or bathroom remodel. Add the $31.88 residential issuance fee. Residential remodels are exempt from the 10% automation fee. The schedule also lists a general remodel inspection of $1.33 per square foot; we read the per-room line as the kitchen price, so confirm with the Permit Processing Counter. These totals do not include electrical, plumbing or mechanical permit items priced on Schedule V; ask the Permit Processing Counter for an estimate.

  • 150 sq ft kitchen remodel: plan check $129.00 plus $398.39 inspection plus $31.88, about $559.
  • 200 sq ft kitchen remodel: $172.00 plus $398.39 plus $31.88, about $602.
  • Small online combo: 8 receptacles and fixtures at $1.96, two branch circuits at $13.66 and one plumbing fixture at $24.08 is $67.08, plus $6.71 automation and $31.88 issuance, about $106. That is item fees plus one issuance fee only; Schedule V's $63.77 minimum inspection fee may raise it. We charge the 10% here, on the item fees only (our reading of item 21), because the remodel exemption is not stated for online combo permits.

Each separate electrical, plumbing or mechanical permit adds its own $31.88 issuance fee. Not included: the state-mandated energy and access surcharge on Schedule II ($73.75 per 1,000 square feet for inspection plus 65% of that for plan check) and the state SMIP fee ($13.00 per $100,000 of valuation), because the schedule does not say which small jobs they apply to. If the surcharge applies, it adds about $122, which would take a 150 sq ft shed from about $246 to about $368.

Homes built in or before 1980 may qualify for the One Irvine Permit Fee Holiday, which waives permit or plan check fees for certain projects up to $1,500 (the IrvineReady! page still prints 1975).

What Does Irvine Check on a Remodel?

The home must meet current smoke and carbon monoxide alarm requirements at final inspection. If the house was built before 1994, Informational Bulletin 321 on water-conserving plumbing fixtures applies.

Who Can Pull the Permit?

Irvine's Bulletin 222 says work on homes, pools and equipment such as water heaters and HVAC is permitted to a state-licensed contractor, with one very limited exception: an owner-builder, who signs the city's Property Owner's Package. In a condominium or townhome, work in or affecting a common area needs the HOA board's written permission and may only be permitted to a licensed contractor. The city checks remodel submittals for completeness in about two business days and you should expect about five business days for the initial plan check.

How to Get a Kitchen Remodel Permit in Irvine

1

Define the scope

List the walls, fixtures, outlets and gas lines you will change and compare them with the online combo limits.

2

Check HOA and condo rules

Review your HOA's process and, in a condo, confirm whether any work touches a common area.

3

Apply online or prepare plans

Use PermitsDIRECT! for small trade work, or prepare the remodel title sheet and plans for IrvineReady!.

4

Pay fees and pass plan check

Pay the emailed fee link; plan-check remodels usually take about five business days for first review.

5

Inspect and finish

Schedule rough and final inspections and have smoke and CO alarms in place for the final.

Frequently Asked Questions

The city's Permits Not Required list covers painting, papering and similar finish work, and no plumbing permit is needed to reinstall or replace a sink, disposal or dishwasher without changing pipes or valves. The list does not name cabinets or counters, so if the job touches wiring, plumbing or walls, plan on a permit and confirm at (949) 724-6313.
Yes, for small trade work, through PermitsDIRECT!. The limits come from the city's pages for its older Automated Online Permit system: a minor residential electrical, plumbing or mechanical combination permit covers up to 10 electrical fixtures and outlets, 4 plumbing fixtures, 1 to 5 gas outlets, one sewer connection and 5 grilles. Larger or structural remodels go through plan check on IrvineReady!.
With plans, plan check is $0.86 per square foot of remodel area with a $95.67 minimum, plus $398.39 inspection per kitchen and the $31.88 issuance fee, about $559 for 150 square feet. Residential remodels skip the 10% automation fee. Schedule V trade items are extra, and a small online combo permit is about $106 in item and issuance fees.
Yes. The city's interior remodel page says the home will need to meet current smoke and carbon monoxide detector requirements at the time of final inspection. Separately, homes built before 1994 fall under Bulletin 321's water-conserving fixture rules.
Inside your unit, you can pull a permit as owner-builder after completing the Property Owner's Package. For condos with shared walls, floors or ceilings, plans must be stamped by a licensed design professional. Work in or affecting a common area needs the HOA board's written permission and may only be permitted to a licensed contractor.