What's Required in Irvine
- Keep an exempt deck or platform no more than 30 inches above grade and not over a basement or story below.
- Get a building permit for any deck more than 30 inches above grade.
- Provide structural plans and calculations signed by a California civil or structural engineer for a raised deck.
- Meet the building setbacks for your zoning district, often five feet side and ten feet rear.
- Show property lines, existing structures and the deck's distance to property lines on the site plan.
- Get separate electrical, plumbing or gas permits for utilities on the deck.
- Include the HOA design approval letter if the property is a condominium.
Do You Need a Permit for a Deck in Irvine?
It depends on height. Irvine's Permits Not Required list exempts platforms, walks and driveways not more than 30 inches above grade and not over any basement or story below. A low, ground-level deck that stays at or under 30 inches fits that exemption. The exemption list calls these platforms; the city's own deck page covers second-story decks and sets the same 30-inch trigger for engineered plans. Above 30 inches, the city treats the project as a second-story deck: you need a building permit, and the city's deck page says you must provide structural plans and calculations prepared and signed by a registered California structural engineer.
A deck that is exempt from the building permit still has to sit where zoning allows, and any lights, outlets, gas lines or a built-in barbecue on it are separate permit items.
Irvine Deck Rules by Scenario
| What you are doing | City filing | Rule |
|---|---|---|
| Ground-level deck or platform 30 inches or less above grade | None | Permits Not Required list |
| Deck more than 30 inches above grade | Building permit | Engineer-signed structural plans and calculations |
| Second-story deck off an upper floor | Building permit | Listed on the city's residential permit list |
| Platform over a basement or a story below | Building permit | Outside the exemption |
| Deck with a roof or patio cover over it | Building permit for the cover | Patio covers need a permit regardless of size |
| Outlets, lights or a gas line on the deck | Electrical or plumbing permit | Separate trade permits |
| Deck on a condominium | Permit plus HOA design approval | City asks for the HOA's approval letter |
How Much Does a Deck Permit Cost in Irvine?
Schedule II, effective August 15, 2026, has no line named deck. The nearest is item 6, Patio Covers, Trellis, Carports, Miscellaneous Residential Structures: plan check $0.54 and inspection $0.66 per square foot, each with a $95.67 minimum per residential job. Add the $31.88 residential issuance fee and the 10% automation fee. We apply the 10% to plan check and inspection only, our reading of item 21; if it also applies to the issuance fee, add about $3.
- 200 sq ft raised deck: $108.00 plan check plus $132.00 inspection is $240.00; with $31.88 issuance and $24.00 automation, about $296.
- 300 sq ft raised deck: $162.00 plus $198.00 is $360.00; with $31.88 and $36.00, about $428.
The line the plan checker applies is the city's decision, so request a fee estimate from the Permit Processing Counter at (949) 724-6313. The engineer's fee is separate from the city's fees. Each separate electrical, plumbing or mechanical permit adds its own $31.88 issuance fee.
Not included: the state-mandated energy and access surcharge on Schedule II ($73.75 per 1,000 square feet for inspection plus 65% of that for plan check) and the state SMIP fee ($13.00 per $100,000 of valuation), because the schedule does not say which small jobs they apply to. If the surcharge applies, it adds about $122, which would take a 150 sq ft shed from about $246 to about $368.
Homes built in or before 1980 may qualify for the One Irvine Permit Fee Holiday, which waives permit or plan check fees for certain projects up to $1,500 (the IrvineReady! page still prints 1975).
How Close to the Property Line Can a Deck Be?
The city's deck page says the deck must comply with the building setbacks in the Zoning Ordinance. For many single-family properties that is five feet from the side property line and ten feet from the rear, but it depends on the location and zoning. Look up your zoning on the city's Zoning Map or Online Parcel Search, or call the Planning Counter at 949-724-6308. On a zero-lot-line home, more common in Turtle Rock and University Park, the city says patio covers and pools may not go in the easement area; ask the Planning Counter about a deck.
What Does the Application Include?
The application package, a site plan showing property lines, existing structures and the deck's distance to the nearest property lines, construction drawings with height dimensions, and the engineer's plans and calculations for a deck over 30 inches. A condominium owner adds the HOA design approval letter. Submit it as a For Permitting--Other project through IrvineReady!; the city checks completeness in about two business days and you should expect two to four business days for the first plan check.
Who Can Pull the Permit?
Irvine's Bulletin 222 says work on homes, pools and equipment such as water heaters and HVAC is permitted to a state-licensed contractor, with one very limited exception: an owner-builder, who signs the city's Property Owner's Package. Contractors show a City of Irvine business license, CSLB pocket card and workers' compensation certificate.
How to Get a Deck Permit in Irvine
Measure the deck height
Measure the walking surface above grade; at 30 inches or less with nothing below, no building permit is needed.
Confirm setbacks and HOA rules
Look up your zoning, confirm the setbacks with the Planning Counter and get any HOA approval.
Hire an engineer
For a raised deck, have a California structural engineer prepare signed plans and calculations.
Submit through IrvineReady!
Upload the application package, site plan and drawings as a For Permitting--Other submittal.
Pay, build and inspect
Pay the emailed fees, then build to the approved plans and schedule each required inspection.