Do You Need a Permit to Build a Deck in Texas?

Inside a Texas city, usually: the default in the state-adopted code exempts only decks up to 200 sq ft, no more than 30 in above grade, not attached to the house and not serving the exit door, and cities amend that. Outside city limits, the state's county code law covers only new houses and large additions.

Statewide rule State-adopted code in cities, amendable Local Government Code 214.212 adopts the 2012 IRC as the municipal residential code and lets cities add, modify or remove requirements.
Height that triggers it Over 30 in, 200 sq ft, or attached (baseline) IRC R105.2 item 10. Fort Worth permits anything over 6 in; San Antonio exempts detached decks to 300 sq ft.
Who issues it Your city building department The IRC applies to residential structures in a municipality, including accessory structures (214.211, 214.212).
Outside city limits County code law covers new houses only Chapter 233 reaches only new houses and additions over 50 percent, with no prior approval and no county fee.
How Texas sets building rules. Texas adopts the International Residential Code as it existed on May 1, 2012 as the municipal residential building code (Local Government Code 214.212); it applies inside cities, which may amend it by ordinance after a public hearing and may consider later ICC editions. Outside cities, the statutes reviewed give counties a residential code role only through Chapter 233, Subchapter F: a county that adopts it may require new houses and large additions to follow the 2008 IRC or the county seat's code, without prior approval or a county fee (233.153).

What does Texas law say about deck permits?

Local Government Code 214.212 adopts the International Residential Code as it existed on May 1, 2012 as the residential building code of Texas cities. Section R105.2 of the 2012 IRC exempts a deck only when all four tests hold: not over 200 square feet, not more than 30 inches above grade at any point, not attached to a dwelling, and not serving the required exit door. Fail any one, and an attached deck always fails, and you need a permit.

Cities may amend the code by ordinance after a public hearing. Houston also exempts uncovered wood decks up to 30 in even when attached; San Antonio raises the detached limit to 300 sq ft; Fort Worth exempts only platforms up to 6 in above grade. In Fort Worth a roofed deck attached to the house is a residential addition, and in Houston a roof takes a deck out of the exemption.

Who issues a deck permit in Texas?

Your city's building or development services department issues the permit, reviews the plans for raised decks and inspects the work. Guard and stair dimensions come from the city's adopted code, which may reflect amendments or a later edition the city has adopted.

Fees are set locally, with one state limit: under Local Government Code 214.907 (H.B. 852, 2019) a city may not consider the value of a residential dwelling or the cost of constructing or improving it when it sets a building permit or inspection fee. Houston, Dallas and Fort Worth cite that rule for their residential fees, and in practice the cities on this site price by square foot, length, trade or a flat fee. Within 45 days of an application, a city must grant or deny the permit, explain in writing why it cannot, or reach a written agreement with you on a deadline (214.904).

Do you need a deck permit outside city limits in Texas?

Outside city limits the picture changes. State law gives counties a residential code role only for new houses and large additions. Local Government Code Chapter 233, Subchapter F lets a county that adopts it by resolution or order hold a new single-family house or duplex on a vacant lot, or an addition that grows a home by more than 50 percent, to the 2008 IRC or the county seat's code. That law cannot be read to require prior approval by the county, and the county may not charge a fee to enforce it.

A deck on its own is neither, so that law does not reach it. In a city's extraterritorial jurisdiction, Local Government Code 212.003 says that, unless other state law authorizes it, the city shall not regulate the use or size of buildings there. A deck in a mapped flood zone is different: Water Code 16.3145 requires every county to adopt flood insurance program rules, and counties may charge for floodplain permits, so call the county floodplain administrator first.

What else applies to a deck even without a permit?

The IRC says a permit exemption does not authorize work that violates the code or other local laws. Setbacks and lot coverage come from city zoning under Local Government Code 211.003; Fort Worth, for example, keeps decks out of front yards. Deed restrictions and HOA covenants apply in and out of city limits. A low exempt deck must still be built to code.

Can a homeowner pull a deck permit in Texas?

Texas licenses the trades. Electrical work needs a state license under Occupations Code 1305.151; the homeowner exception in 1305.003 covers only work in a home you own and live in that a city ordinance does not specifically regulate, and the four cities on this site all run separate electrical permits. Under Occupations Code 1301.051 you need no plumbing license to plumb your own homestead. Who may sign for the building permit itself is a city rule: Fort Worth lets owner-occupants with a homestead permit pull it; Dallas's homeowner form does not mention decks, so ask Planning and Development; and San Antonio lets a homeowner apply if they will live in the home more than 12 months.

Deck Permit rules in the 4 Texas cities we have researched

Each row is read off our page for that city, which quotes the city’s own code section and fee schedule. Follow the city link for the conditions on each rule, the worked fee examples and the sources.

CityLow deckWhere the permit line sitsCity fee for a typical deck
DallasExempt if small and low ⚠Exempt only when all five tests hold: not over 200 sq ft, not more than 30 in above grade at any point, not attached to a dwelling, clear of the overhead service drop, and not serving the required exit door. Any attached deck needs a permit at any size or height; a detached patio cover under 200 sq ft is separately exempt.About $461 for a new 300 sq ft deck (300 x $1.07 + $125 inspection + $15 technology); $1,038 if the $577 residential plan review minimum is charged; $321 to rebuild in place.
Fort WorthExempt below a heightNo permit only for platforms, walks and decks not more than 6 in above grade and not over a basement or story below; anything higher, even a deck two steps up, needs a building permit. A roofed deck attached to the house is a residential addition.$110.96 for a 12x14 deck ($61.01 up to 175 sq ft + $33.08 application + $16.87 technology); $176.95 for 300 sq ft ($102 + $0.20 per sq ft over 175 + fees); $216.95 for 500 sq ft.
HoustonExempt below a heightNo permit for an uncovered wood deck accessory to a one- or two-family home not more than 30 in above grade, attached or not, and for a freestanding deck up to 200 sq ft that is 30 in or lower and does not serve the required exit door. Above 30 in, or with a roof, a residential building permit with plan review.About $293 for a 300 sq ft raised deck ($208 square-footage fee + 25% plan review + $33.56 admin; $91.06 minimum); about $399 for a 500 sq ft covered deck; $0 exempt.
San AntonioExempt if small and lowExempt only when all four tests hold: an uncovered deck not over 300 sq ft, not more than 30 in above grade at any point, not attached to the house, not serving a required exit door. Attached decks need the permit at any height; decks over 1,000 sq ft or two stories go to plan review.$184 flat Carport Covers and Decks Fee for decks up to 1,000 sq ft and one story; $198.72 with the two 4% surcharges online; $0 exempt.

A ⚠ marks a city whose own documents give two different answers. To compare more cities, see deck permit thresholds in 30 cities and deck permit fees in 30 cities.

Not in one of these cities?

The rule that binds you is the one your own city has adopted, or your county’s if you live outside city limits. Ask the building department for its list of work exempt from permit and its zoning rules for accessory structures before you buy materials; the phone call is free and the answer is specific to your lot.

Frequently asked questions

Under the 2012 International Residential Code, which Texas adopts as the city building code, a deck is exempt only if it is not over 200 square feet, not more than 30 inches above grade at any point, not attached to the house and not serving the required exit door. Cities may change those limits by ordinance.
Under the state-adopted IRC baseline, yes, at any size or height. Dallas and San Antonio follow that. Fort Worth's test is height: a permit above 6 inches, and a roofed attached deck is an addition. Houston's exemption also covers uncovered wood decks up to 30 inches above grade even when attached. Check your own city's list.
State law gives counties a residential code role only for new single-family houses, duplexes and additions that grow a home by more than half, and the county may not require prior approval or charge an enforcement fee. A deck alone is outside that law, though floodplain rules still apply in a mapped flood zone.
Each city sets its own fees, but Local Government Code 214.907 bars a city from considering the value of a residential dwelling or the cost of constructing or improving it. Houston, Dallas and Fort Worth price decks by square foot, and San Antonio charges a flat fee.
Electrical work needs a state license under Occupations Code 1305.151. The homeowner exception covers only work in a home you own and live in that no city ordinance specifically regulates, and Houston, San Antonio and Fort Worth treat deck wiring as a separate electrical permit.

Sources

Every statement about state law on this page is taken from the documents below, read on the date shown at the top. Laws and adopted code editions change; the linked text is the authority, and your city or county building department has the final word on your project.

  • Local Government Code Sec. 214.212(a); Local Government Code Sec. 214.211(3); Local Government Code Sec. 214.212(c); Local Government Code Sec. 214.212(e); Local Government Code Sec. 214.212(d); Local Government Code Sec. 214.212(b); Local Government Code Sec. 214.907(a) (H.B. 852, 2019); Local Government Code Sec. 214.907(a)(1)-(2); Local Government Code Sec. 214.904(b); Local Government Code Sec. 214.904(b)(1)-(3) — statutes.capitol.texas.gov
  • 2012 International Residential Code Sec. R105.2 (Public.Resource.Org copy on archive.org, a mirror), Building item 10; 2012 International Residential Code Sec. R105.2 (Public.Resource.Org copy on archive.org, a mirror) — archive.org
  • Local Government Code Sec. 233.151(a)(1); Local Government Code Sec. 233.151(a); Local Government Code Sec. 233.152; Local Government Code Sec. 233.153(a); Local Government Code Sec. 233.153(d)(1); Local Government Code Sec. 233.153(f) — statutes.capitol.texas.gov
  • Local Government Code Sec. 212.003(a); Local Government Code Sec. 212.003(a)(1)-(3) — statutes.capitol.texas.gov
  • Local Government Code Sec. 211.003(a) — statutes.capitol.texas.gov
  • Water Code Sec. 16.3145; Water Code Sec. 16.324 — statutes.capitol.texas.gov
  • Occupations Code Sec. 1305.151; Occupations Code Sec. 1305.003(a)(6) — statutes.capitol.texas.gov
  • Occupations Code Sec. 1301.051 — statutes.capitol.texas.gov