Permit Required? Required
Typical Fee Range $300–$1,000 Combines residential occupancy and trade-specific fees.
Fee Method Project-based

What's Required in Milwaukee

  • Residential occupancy permit of $65 per unit may apply.
  • Electrical permit mandatory ($50 base fee).
  • Plumbing permit required for fixture changes.
  • Detailed floor plan showing structural and system changes.
  • GFCI protection required for all countertop receptacles.
  • All work must be inspected before closing walls.

How to Get a Kitchen Remodel Permit in Milwaukee

1

Step 1: Design Review

Create plans showing the new kitchen layout and system updates.

2

Step 2: Online Filing

Submit applications for building and trades via the DNS portal.

3

Step 3: Pay Fees

Pay base fees plus itemized trade costs.

4

Step 4: Rough Inspections

Verify hidden wiring and piping before installing cabinets.

5

Step 5: Final Sign-off

A final walkthrough of all fixtures and safety features.

Frequently Asked Questions

The base price for an electrical permit is $50.
Yes, it is $65 per unit for residential occupancy.
You will be charged triple the regular permit fee.