Permit Required?
Required
Typical Fee Range
$200–$800
Includes general building review; trade permits carry separate flat fees.
Fee Method
Valuation-based
What's Required in Virginia Beach
- Permit required for structural work or system modifications.
- Floor plan showing existing and proposed layout.
- Electrical permit for GFCI protection and new circuits.
- Plumbing permit for moving sinks or gas lines.
- Mechanical permit if installing a new range hood vent.
- Verification of smoke and CO detector compliance.
How to Get a Kitchen Remodel Permit in Virginia Beach
1
Step 1: Create Plans
Draft a scale floor plan of the new kitchen layout.
2
Step 2: Submit Portal
Apply for a 'Residential Alteration' permit via Accela.
3
Step 3: Trade Sub-permits
Contractors must pull individual permits for plumbing and electric.
4
Step 4: Rough Inspections
Verify wiring and piping before closing walls.
5
Step 5: Final Sign-off
Final inspection of all fixtures and safety systems.
Frequently Asked Questions
If no plumbing/electrical is moved, cosmetic swaps are exempt.
Yes, they must be pulled individually but are linked to the project.
Expect 10-14 business days for residential reviews.