What's Required in Corpus Christi

  • Tile, cabinets, paint and sheetrock repairs under 32 square feet need no permit.
  • Demolishing a bathroom or moving walls needs a building permit.
  • New or replaced drains, vents or water lines need a plumbing permit.
  • Adding an exhaust fan needs a mechanical permit.
  • Bathroom receptacles and those within 6 feet of a tub or shower need GFCI protection.
  • Homeowner trade permits require a notarized Homeowner's Work Affidavit for a homestead.
  • Gas service work must be done by a state-licensed plumber.

Do you need a permit to remodel a bathroom in Corpus Christi?

A cosmetic refresh, no; a gut, yes. The Development Services Department's Homeowner's Guide to Permitting needs no permit for tile, wood or laminate flooring, cabinets and vanities, paint or wallpaper, or sheetrock repair under 32 square feet. It requires a permit when you are demolishing a bathroom, removing or re-framing walls, removing sheetrock or insulation, or replacing a window or the subfloor. Trade work has its own permits: installing or replacing a drain or vent, adding water lines or installing a water heater needs a plumbing permit; adding receptacles, circuits or lights needs an electrical permit; and adding an exhaust fan in a restroom needs a mechanical permit. Removing and reinstalling the same toilet or sink with no modifications needs no permit, and neither does stopping leaks; the guide does not say whether a new fixture in the same spot counts, so ask.

How much does a bathroom remodel permit cost in Corpus Christi?

Residential permits are priced on square footage, as Texas Local Government Code 214.907 (H.B. 852) bars value-based residential fees. The FY 2026 Development Fee Schedule, effective October 1, 2025 to September 30, 2026, charges plan review at $0.146 per square foot and the building permit at $0.461 per square foot with a $146.41 minimum, and each electrical, mechanical or plumbing permit at $0.075 per square foot with a $146.41 minimum. For an 80 sq ft bathroom gut that is $11.68 plus the $146.41 minimum permit (80 x $0.461 = $36.88 falls below it), or $158.09, and $450.91 with plumbing and electrical permits at their minimums. An exhaust fan adds a mechanical permit. The schedule prints a $146.41 Minimum Permit Fee line under each trade permit, below the commercial row; we read it as the residential floor too, so confirm with Development Services before budgeting. The schedule does not say which area it uses for trade permits; we used the work area. Starred fees add the schedule's 4.5% surcharge, about $20 if applied to the whole $450.91. The schedule's period has ended and it is still the newest posted, so confirm.

What you are doingCity filingRule
New tile floor, vanity cabinet or paintNo permitExempt in the Homeowner's Guide
Removing and reinstalling the same toilet or sink, no modificationsNo permitA new fixture in the same spot is not addressed; ask Development Services
Gutting the bathroom or moving wallsBuilding permit$0.146 plus $0.461 per sq ft, $146.41 minimum
New or relocated drain, vent or water linePlumbing permit$0.075 per sq ft, $146.41 minimum
New outlets, circuits or lightsElectrical permitGFCI in bathrooms and within 6 feet of a tub or shower
Adding an exhaust fanMechanical permit$0.075 per sq ft, $146.41 minimum
New water heaterPlumbing permitGas units: licensed plumber for gas piping

What code rules matter in a Corpus Christi bathroom?

The city uses the 2021 International Residential Code and the 2020 National Electrical Code with local amendments effective August 1, 2023. Its electrical amendments require ground-fault protection for bathroom receptacles and for receptacles within 6 feet of a sink or of a bathtub or shower stall, and every circuit except lighting circuits must carry at least 20 amperes. Development Services has also issued a code interpretation on shower pan liner inspection and testing; ask for it if you are building a tiled shower. File the Residential Building Permit Application (Form 1003) in the Dynamic Portal with existing and proposed floor plans and a scope of work, plus an elevation certificate in a flood plain. Expect frame, insulation and final building inspections, and rough-in, top-out and final plumbing inspections.

Can you do the work yourself?

Yes, on your own homestead. The city's residential code lets it issue permits to owners of a single-family home they own and occupy as their homestead, and homeowners may pull their own plumbing, electrical and mechanical permits there by signing the Homeowner's Work Affidavit, which lets only the resident owner do the work. Natural gas work is the exception and must be permitted and installed by a state-licensed plumber. Otherwise hire licensed contractors registered with the city.

How to Get a Bathroom Remodel Permit in Corpus Christi

1

Define the scope

Decide whether the job is cosmetic or a gut, and list the plumbing, electrical and fan work.

2

Prepare plans

Draw existing and proposed floor plans and a scope of work; add an elevation certificate in a flood plain.

3

Apply in the Dynamic Portal

File Form 1003 and the trade permits, or add your licensed contractors to the trade permits.

4

Pay the fees

Pay the square-foot building fees and each trade permit, collected when the building permit is issued.

5

Pass inspections

Schedule plumbing rough-in and top-out before covering walls, then the frame, insulation and final inspections.

Frequently Asked Questions

Only for more than cosmetic work. Tile, cabinets, paint and sheetrock repairs under 32 square feet need no permit. Demolishing the bathroom, moving walls, or adding drains, water lines, circuits or an exhaust fan needs building and trade permits.
No, if you remove and reinstall the same fixture with no modifications; the guide does not say whether a new toilet in the same spot counts, so ask. A new or relocated drain or vent, or new water lines, needs a plumbing permit at $0.075 per square foot with a $146.41 minimum.
Under the FY 2026 schedule, an 80 square foot bathroom gut costs $158.09 for plan review and the minimum building permit, and $450.91 with plumbing and electrical permits at the $146.41 floor we read in the schedule. The schedule adds a 4.5 percent surcharge to starred fees.
Yes. The city's Homeowner's Guide lists adding an exhaust fan in a restroom as work that needs a mechanical permit, and wiring a new fan circuit needs an electrical permit as well.
Yes, on a home you own and occupy as your homestead. Texas law does not require a plumbing license for plumbing in your own homestead, and the city issues homeowner plumbing permits with a Homeowner's Work Affidavit. Gas service work still requires a state-licensed plumber.