Permit Required? Required (over 7 ft)
Typical Fee Range $50–$150 Fences under 7 feet are exempt. Total fee includes a $25 zoning examination fee plus codes technology surcharges.
Fee Method Valuation-based

What's Required in Nashville

  • No permit required for fences under 7 feet in height
  • Front yard fences on corner lots may have lower height limits due to sight triangle rules
  • Zoning examination fee ($25) applies to all permits requiring zoning review
  • Site plan or property survey required for all applications
  • Homeowners may pull permits for primary residences
  • Final inspection required to ensure compliance with setbacks

How to Get a Fence Permit in Nashville

1

Step 1: Check Exemption

Confirm your fence is under 7 feet to avoid a building permit requirement.

2

Step 2: Survey & Plot Plan

Obtain a property survey and sketch the proposed fence location.

3

Step 3: ePermits Application

Apply for a building permit via epermits.nashville.gov if over height thresholds.

4

Step 4: Fee Payment

Pay the $25 zoning fee plus valuation-based building fees online.

5

Step 5: Inspection

Schedule a final inspection through the ePermits portal once construction is complete.

Frequently Asked Questions

Only if the fence is 7 feet tall or taller.
For fences over 7 feet, fees start around $50, including the mandatory $25 zoning exam fee.
Rear/side yard fences are typically allowed up to 7–8 feet; front yards are more restricted.