Permit Required?
Required
Typical Fee Range
$500–$1,500
Typically based on the total project value.
Fee Method
Valuation-based
What's Required in Memphis
- Permit required for changes to layout, structural, or systems.
- Electrical permit required for new circuits and outlets.
- Plumbing permit mandatory for relocating sinks or gas lines.
- GFCI protection required for all countertop receptacles.
- Detailed floor plan showing structural changes.
- All work must be inspected before closing walls.
How to Get a Kitchen Remodel Permit in Memphis
1
Step 1: Detailed Design
Create plans showing existing and proposed kitchen layout.
2
Step 2: Submit Portal
Upload plans to the Memphis permit application site.
3
Step 3: Trade Sub-permits
Ensure electrician and plumber file their own permits.
4
Step 4: Rough-in Inspections
Verify all hidden systems before installing cabinets/drywall.
5
Step 5: Final Walkthrough
A final inspection of all fixtures and safety devices.
Frequently Asked Questions
Usually no for projects under $1,000 that don't change layout.
Expect approximately two weeks for permit approval.
Yes, for their primary residence if they perform the work.