Permit Required? Required
Typical Fee Range $500–$1,500 Typically based on the total project value.
Fee Method Valuation-based

What's Required in Memphis

  • Permit required for changes to layout, structural, or systems.
  • Electrical permit required for new circuits and outlets.
  • Plumbing permit mandatory for relocating sinks or gas lines.
  • GFCI protection required for all countertop receptacles.
  • Detailed floor plan showing structural changes.
  • All work must be inspected before closing walls.

How to Get a Kitchen Remodel Permit in Memphis

1

Step 1: Detailed Design

Create plans showing existing and proposed kitchen layout.

2

Step 2: Submit Portal

Upload plans to the Memphis permit application site.

3

Step 3: Trade Sub-permits

Ensure electrician and plumber file their own permits.

4

Step 4: Rough-in Inspections

Verify all hidden systems before installing cabinets/drywall.

5

Step 5: Final Walkthrough

A final inspection of all fixtures and safety devices.

Frequently Asked Questions

Usually no for projects under $1,000 that don't change layout.
Expect approximately two weeks for permit approval.
Yes, for their primary residence if they perform the work.