Permit Required? Required
Typical Fee Range $800–$2,000 Includes building, electrical, and plumbing permits for living spaces.
Fee Method Valuation-based

What's Required in Memphis

  • Building permit required to convert or build habitable space.
  • Zoning approval needed for secondary dwelling units.
  • Must meet all standard building, electrical, and plumbing codes.
  • HVAC and electrical work are mandatory inclusions.
  • Separate utility connections or approved shared capacity required.
  • Site plan must show parking and setbacks.

How to Get a ADU Permit in Memphis

1

Step 1: Zoning Check

Ensure your lot allows for a secondary dwelling unit.

2

Step 2: Professional Plans

Develop detailed construction drawings for a guest house or ADU.

3

Step 3: Submit Portal

Apply online through Memphis permit services.

4

Step 4: Comprehensive Review

Staff review for zoning, safety, and utility compliance.

5

Step 5: Certificate of Occupancy

Final inspection required before habitation.

Frequently Asked Questions

Converting a garage to living space averages $800 to $1,500.
Approval for larger construction projects takes about two weeks.
Homeowners can pull permits for their primary residence.