Permit Required?
Required
Typical Fee Range
$800–$2,000
Includes building, electrical, and plumbing permits for living spaces.
Fee Method
Valuation-based
What's Required in Memphis
- Building permit required to convert or build habitable space.
- Zoning approval needed for secondary dwelling units.
- Must meet all standard building, electrical, and plumbing codes.
- HVAC and electrical work are mandatory inclusions.
- Separate utility connections or approved shared capacity required.
- Site plan must show parking and setbacks.
How to Get a ADU Permit in Memphis
1
Step 1: Zoning Check
Ensure your lot allows for a secondary dwelling unit.
2
Step 2: Professional Plans
Develop detailed construction drawings for a guest house or ADU.
3
Step 3: Submit Portal
Apply online through Memphis permit services.
4
Step 4: Comprehensive Review
Staff review for zoning, safety, and utility compliance.
5
Step 5: Certificate of Occupancy
Final inspection required before habitation.
Frequently Asked Questions
Converting a garage to living space averages $800 to $1,500.
Approval for larger construction projects takes about two weeks.
Homeowners can pull permits for their primary residence.