Permit Required? Depends on scope (trade permits)
Typical Fee Range $27–$571 Tile and paint need no permit; even a same-spot fixture swap needs a $27 ACHD card
Fee Method ACHD plumbing + PLI permits ($130 min each)

What's Required in Pittsburgh

  • Tile, paint, cabinets, countertops and similar finish work need no permit.
  • All plumbing in Pittsburgh is permitted by the Allegheny County Health Department, not the city.
  • Any plumbing installed or altered needs an approved ACHD plan, including fixture replacement cards for in-place swaps.
  • ACHD charges $80 for a Level 1 plan, $22 per fixture and $27 for a fixture replacement card.
  • Starting plumbing work before the permit adds a fee; ACHD lists late fees of $144 within 72 hours and $280 after.
  • Installing or replacing an exhaust fan needs a PLI mechanical permit.
  • New circuits, receptacles and lights need a PLI electrical permit, eligible for a one-day EZ permit.
  • Each PLI permit costs $6 per $1,000 of value with a $130 minimum, plus $11.50 in fixed fees.
  • Landlords must hire a master plumber for plumbing in rental units.

Do You Need a Permit to Remodel a Bathroom in Pittsburgh?

Usually, but not from the city alone. PLI's Work Not Requiring a Permit page exempts painting, papering, tiling, carpeting, cabinets, countertops and similar finish work, so new tile and paint need nothing. Plumbing is another matter: PLI says the Allegheny County Health Department (ACHD) Plumbing Division is responsible for plumbing permits, and ACHD says a plumbing plan must be approved before any plumbing is installed or altered, including replacement cards for in-place replacements. Its rules exempt faucet and valve repairs and clearing stoppages, but require a permit when any part of the plumbing system becomes defective and is replaced.

PLI handles the rest. A new or replacement exhaust fan is a residential mechanical scope; new circuits, GFCI receptacles and lights are electrical work eligible for a one-day EZ permit; and removing a non-load-bearing wall is an EZ building scope. PLI's electrical page even lists in-kind replacement of devices and light fixtures as a permit work scope, although its licensing rules call some like-for-like device swaps exempt, so ask before you skip it. An EZ permit covers one scope only; several scopes go on a standard application.

Pittsburgh Bathroom Permit Rules by Scenario

What you are doingCity filingRule
Tile, paint, vanity cabinet, mirrorNonePLI exempt list, finish work
Fixing a faucet or clearing a clogNoneACHD Article XV exempt work
Replacing a toilet, sink or tub in the same spotACHD fixture replacement card ($27)ACHD fee schedule; permitting page
Moving the toilet or shower, or adding fixturesACHD plumbing permit ($80 plus $22 per fixture)ACHD fee schedule, Level 1
Installing or replacing an exhaust fanPLI mechanical permitPLI mechanical, minor alteration
New GFCI circuit or lightingPLI electrical permit (EZ eligible)PLI EZ electrical, power and lighting
Moving a non-load-bearing wallPLI EZ building permitPLI EZ building scopes

How Much Do Bathroom Permits Cost in Pittsburgh?

ACHD's fee schedule, effective January 1, 2023, charges $80 for a Level 1 plan (0 to 5 fixtures) plus $22 per fixture, or $27 for a fixture replacement card. Starting plumbing work before the permit brings a fee on top of the permit fees under ACHD's rules, and the fee schedule lists late fees of $144 within 72 hours and $280 after that. Each PLI permit costs the 2026 residential base fee of $6.00 per $1,000 of its work value, minimum $130, plus a $4.50 state training fund fee, a $5.00 digital record retention fee and a $2 technology fee at the minimum, so a small permit is $141.50.

Two examples. Swapping a toilet in the same spot: $27. A full remodel that moves the shower, toilet and lavatory, adds a GFCI circuit and a vented fan: ACHD $80 + 3 fixtures at $22 = $146, electrical $141.50 and mechanical $141.50, for $429. Moving a non-load-bearing wall in the same job adds a $141.50 building permit, for $570.50. Those are PLI's residential rates; its permitting page puts attached single- and two-family dwellings in the commercial category, where the minimum base fee is $605, so confirm which category the portal assigns your house.

Who Can Do the Work?

Plumbing is not a city permit at all: the Allegheny County Health Department issues it through its Citizen Access Portal. ACHD's 2025 Article XV revision lets a bona fide owner presently occupying an existing single-family building do the plumbing; otherwise a licensed master plumber does, and landlords must hire a master plumber for rental units. For PLI permits, the homeowner can do building work on a primary residence; PLI's licensing rules require an electrical trade license for work that needs an electrical permit and an HVAC/Mechanical trade license to install or replace mechanical systems.

How to Get a Bathroom Remodel Permit in Pittsburgh

1

Sort the scope

Finish work needs nothing; plumbing goes to ACHD; fans, wiring and walls go to PLI as separate permits.

2

File the ACHD plumbing plan

Submit the plan or a $27 replacement card through ACHD's Citizen Access Portal and wait for approval before touching the plumbing.

3

File PLI permits in OneStopPGH

Use one-day EZ permits for single scopes like a new circuit, or a standard application if several PLI scopes are involved.

4

Rough inspections before closing walls

ACHD inspects plumbing as work proceeds; request PLI electrical and mechanical inspections through OneStopPGH.

5

Final inspections

ACHD requires a final inspection on every plumbing permit; close out each PLI permit with its final.

Frequently Asked Questions

You need an Allegheny County Health Department fixture replacement card, which costs $27. ACHD, not the city, permits plumbing in Pittsburgh, and its permitting page says any plumbing installed or altered needs approval, including replacement cards. Fixing a faucet or clearing a clog needs nothing.
The Allegheny County Health Department Plumbing Division. PLI's permitting page says ACHD is responsible for plumbing permits, and ACHD takes plans and permits through its Citizen Access Portal or in person at 2121 Noblestown Road. Level 1 plans cost $80 plus $22 per fixture.
ACHD's 2025 Article XV revision allows a bona fide owner presently occupying an existing single-family building to install or alter plumbing; everyone else must be a licensed master plumber or work for one. Landlords must hire a master plumber for rental units. You still need the ACHD plan approval and permit.
Yes. PLI's residential mechanical scopes include replacement or installation of exhaust fans as a minor alteration, so a new or replacement fan needs a mechanical permit, typically $141.50. Wiring a new fan circuit is a separate electrical permit.
From $27 for a same-spot fixture replacement card to about $429 for a remodel that relocates three fixtures and adds a circuit and a fan, or $570.50 if a non-load-bearing wall moves too. Each PLI permit has a $130 minimum base fee plus $11.50 in fixed fees.