Permit Required?
Required
Typical Fee Range
$1,100–$2,500
Uses 'New Construction' residential base fee ($1,100) plus zoning and trade permits.
Fee Method
Project-based
What's Required in Columbus
- Permitted 'by-right' on residential lots as of late 2025
- Maximum size 1,000 sq ft or 65% of the principal unit (whichever is greater)
- Maximum height is 25 feet or the height of the primary building
- Independent cooking, sleeping, and sanitation facilities must be included
- Historic districts (German Village, etc.) still require Commission approval
- Lot coverage limit of 65% total including ADU and primary unit
How to Get a ADU Permit in Columbus
1
Step 1: Zoning Verification
Confirm lot coverage and setbacks for ADU eligibility.
2
Step 2: Professional Plans
Develop IRC-compliant construction drawings.
3
Step 3: Portal Submission
Submit 'Residential New Construction' for the ADU unit.
4
Step 4: Fee Payment
Pay building ($1,100) and zoning ($150–$300) fees online.
5
Step 5: Full Inspections
Schedule full sequence: Foundation, Framing, Trades, and Final.
Frequently Asked Questions
Yes, 'by-right' legislation allows ADUs on most residential lots as of late 2025.
City fees start around $1,500+ including building and zoning review.
Typically 1,000 square feet or 65% of the principal dwelling.