Permit Required? Required
Typical Fee Range $500–$1,500 Fees based on project value; includes building and trade permit components.
Fee Method Valuation-based

What's Required in Baltimore

  • Permit required for structural changes and fixture relocation.
  • Plumbing permit required for new piping or moving fixtures.
  • Electrical permit mandatory for new circuits or panel upgrades.
  • Mechanical permit required for HVAC or gas line changes.
  • Must follow 2021 building code safety standards.
  • Work must be performed by licensed professionals.

How to Get a Kitchen Remodel Permit in Baltimore

1

Step 1: Design Plans

Prepare plans showing structural and layout changes.

2

Step 2: Contractor Selection

Ensure your contractor is licensed and registered with the county.

3

Step 3: Portal Submission

Apply for the residential alteration permit online.

4

Step 4: Technical Review

County staff review plans for electrical, plumbing, and structural safety.

5

Step 5: Inspections

Schedule rough-in and final inspections for all trades.

Frequently Asked Questions

No, permits are generally not required for cosmetic updates.
Yes, if they are in the same location and no plumbing/electric is moved.
Yes, plumbing and electrical permits must be pulled by licensed trades.