Permit Required? Required
Typical Fee Range $500–$1,500 Building remodel fee ($560) plus $100 application fee per trade.
Fee Method Project-based

What's Required in Tampa

  • Building permit required for structural changes or utility relocations
  • Electrical permit required for new circuits, outlets, and lighting
  • Plumbing permit required for moving sinks, gas lines, or dishwashers
  • Mechanical permit required for range hood exhaust venting
  • Cosmetic work like painting or cabinet swaps (no utility move) is exempt
  • GFCI protection mandatory for all kitchen countertop outlets

How to Get a Kitchen Remodel Permit in Tampa

1

Step 1: Prep Drawings

Create scale drawings showing existing vs. proposed layout.

2

Step 2: Accela Submission

Apply for 'Residential Remodel' on the Accela portal.

3

Step 3: Pay Fees

Pay the $560 remodel inspection fee plus trade application fees ($100/trade).

4

Step 4: Record NOC

Record the Notice of Commencement if project value exceeds $2,500.

5

Step 5: Multi-stage Inspections

Schedule rough-in (trades/framing) and final inspections via the portal.

Frequently Asked Questions

Yes, if moving plumbing, electrical, or walls.
Expect to pay $500–$1,500 total including building and trade-specific fees.
No, cosmetic cabinetwork is specifically exempt from building permits in Tampa.