Permit Required?
Required
Typical Fee Range
$500–$1,500
Building remodel fee ($560) plus $100 application fee per trade.
Fee Method
Project-based
What's Required in Tampa
- Building permit required for structural changes or utility relocations
- Electrical permit required for new circuits, outlets, and lighting
- Plumbing permit required for moving sinks, gas lines, or dishwashers
- Mechanical permit required for range hood exhaust venting
- Cosmetic work like painting or cabinet swaps (no utility move) is exempt
- GFCI protection mandatory for all kitchen countertop outlets
How to Get a Kitchen Remodel Permit in Tampa
1
Step 1: Prep Drawings
Create scale drawings showing existing vs. proposed layout.
2
Step 2: Accela Submission
Apply for 'Residential Remodel' on the Accela portal.
3
Step 3: Pay Fees
Pay the $560 remodel inspection fee plus trade application fees ($100/trade).
4
Step 4: Record NOC
Record the Notice of Commencement if project value exceeds $2,500.
5
Step 5: Multi-stage Inspections
Schedule rough-in (trades/framing) and final inspections via the portal.
Frequently Asked Questions
Yes, if moving plumbing, electrical, or walls.
Expect to pay $500–$1,500 total including building and trade-specific fees.
No, cosmetic cabinetwork is specifically exempt from building permits in Tampa.