Permit Required?
Required
Typical Fee Range
$150–$600
Fees based on project value; includes structural plan review.
Fee Method
Valuation-based
Apply Online
Apply at Community Development Department →
What's Required in Sacramento
- Building permit required for decks over 30 inches above grade.
- Structural plans showing footings and joist spacing.
- Mandatory 42-inch railing for decks over 30 inches high.
- Footings must reach a minimum depth of 12 inches.
- Ledger attachments must meet Title 24 flashing standards.
- Baluster spacing must not allow a 4-inch sphere to pass.
How to Get a Deck Permit in Sacramento
1
Step 1: Design Review
Create structural drawings showing loads and materials.
2
Step 2: Digital Submission
Upload plans via the city's e-Permit portal.
3
Step 3: Code Audit
Reviewers check for deck-to-house attachment and footing size.
4
Step 4: Fee Payment
Pay valuation-based fees to activate the permit.
5
Step 5: Inspection Chain
Requires footing, framing, and final inspections.
Frequently Asked Questions
Only if it is more than 30 inches high or attached to the house.
Usually not for standard wood decks, but custom designs may require a stamp.
Residential railings must be at least 42 inches high in California.