| HISTORIC PRESERVATION OR URBAN DESIGN COMMISSION FEES |
FEE |
UNIT |
| Type I Certificate of Appropriateness |
$10 |
each |
| Type II Certificate of Appropriateness (Staff Review only) |
$10 |
each |
| Type II Certificate of Appropriateness (Commission decision) |
$100 |
each |
| Type III Certificate of Appropriateness (Additions only) |
$100 |
each |
| Type III Certificate of Appropriateness (New principal structure) |
$200 |
each |
| Type IV Certificate of Appropriateness (Threat to public health and safety) |
$100 |
each |
| Type IV Certificate of Appropriateness (Lack of reasonable economic return) |
$200 |
each |
| Court reporter for Type IV hearing |
at cost unless hired by applicant |
|
| Rezoning reviews (included in Office of Zoning & Development fees) |
|
|
| Subdivisions governed by the Commission |
$100 |
each |
| Variances |
$100 |
each |
| BOARD OF ZONING APPEALS |
FEE |
UNIT |
| Variances Applications |
|
|
| R-1, R-2, R-2A, R-3, R-3A, R-4, R-4A, R-4B, R-5, LD, HD |
$100 |
each |
| RG Sectors 1-6, MR Sectors 1-8 |
$500 |
each |
| R-LC, O-I, C-1, C-2, C-3, C-4, C-5, I-1, I-2, MRC-1, MRC-2, MRC-3, LW, NC, all SPI Districts |
$625 |
each |
| Special Exceptions |
|
each |
| R-1, R-2, R-2A, R-3, R-3A, R-4, R-4A, R-4B, R-5, LD, HD |
$100 |
each |
| RG Sectors 1-6, MR Sectors 1-8 |
$500 |
each |
| R-LC, O-I, C-1, C-2, C-3, C-4, C-5, I-1, I-2, MRC-1, MRC-2, MRC-3, LW, NC, all SPI Districts |
$625 |
each |
| Deferral Fee |
cost provided by staff |
each |
| Appeal Fee |
$250 |
each |
| ZONING REVIEW BOARD |
FEE |
UNIT |
| REZONING APPLICATIONS |
|
|
| To R-1, R-2, R-2A, R-2B, R-3, R-3A, R-4, R-4A, or R-4B |
$500 |
each |
| To R-5, RG, PD-H, or MR |
|
|
| 1 acre or less |
$500 |
each |
| 1+ to 5 acres |
$625 |
each |
| 5+ to 10 acres |
$750 |
each |
| 10+ acres |
$1,250 |
each |
| To R-LC, O-I, C-1, C-2, C-4, C-5, I-1, & or I-2 |
|
|
| 1 acre or less |
$1,000 |
each |
| 1+ to 5 acres |
$1,500 |
each |
| 5+ to 10 acres |
$2,000 |
each |
| 10+ acres |
$3,000 |
each |
| To C-3, PD-OC, PD-MU or PD-BP |
|
|
| 1 acre or less |
$3,000 |
each |
| 1+ to 5 acres |
$4,500 |
each |
| 5+ acres |
$6,000 |
each |
| To any Special Public Interest (SPI) District |
$3,000 |
each |
| To LW, MRC or NC |
|
|
| 1 acre or less |
$3,000 |
each |
| 1+ to 5 acres |
$4,500 |
each |
| 5+ acres |
$6,000 |
each |
| SITE PLAN AMENDMENTS |
|
|
| In R-1, R-2, R-2A, R-2B, R-3, R-3A, R-4, R-4A, or R-4B |
$500 |
each |
| In R-5, RG, PD-H or MR |
|
|
| 1 acre or less |
$500 |
each |
| 1+ to 5 acres |
$625 |
each |
| 5+ to 10 acres |
$750 |
each |
| 10+ acres |
$1,250 |
each |
| In R-LC, O-I, C-1, C-2, C-4, C-5, I-1, or I-2 |
|
|
| 1 acre or less |
$1,000 |
each |
| 1+ to 5 acres |
$1,500 |
each |
| 5+ to 10 acres |
$2,000 |
each |
| 10+ acres |
$2,500 |
each |
| In C-3, PD-OC, PD-MU, or PD-BP |
|
|
| 1 acre or less |
$2,500 |
each |
| 1+ to 5 acres |
$3,250 |
each |
| 5+ acres |
$4,000 |
each |
| In any Special Public Interest (SPI) District |
$3,250 |
each |
| In LW, MRC or NC |
|
|
| 1 acre or less |
$3,000 |
each |
| 1+ to 5 acres |
$4,500 |
each |
| 5+ acres |
$6,000 |
each |
| Special Use Permit |
$400 |
each |
| Transfer of ownership |
$200 |
each |
| Comprehensive Development Amendment |
$1,000 |
each |
| Transfer of development rights |
$400 |
each |
| SPECIAL ADMINISTRATIVE PERMITS |
FEE |
UNIT |
| Exterior demo, outdoor dining new/expansion, or non-expansion |
$250 |
each |
| Developments < 50,000 sq.ft. of floor area |
$500 |
each |
| Developments 50,000 to 250,000 sq.ft. of floor area |
$1,000 |
each |
| Developments ≥ 250,000 sq.ft. of floor area: |
$1,500 |
each |
| SUBDIVISIONS |
FEE |
UNIT |
| Lot frontages facing an existing City of Atlanta right-of-way |
$250 application, $10/lot |
each |
| Up to ten acres requiring the installation of any right-of-way which is to be dedicated to the City of Atlanta or the connection of private streets to City of Atlanta right-of-way |
$250 application, $10/lot |
each |
| more than ten acres requiring the installation of any right-of-way which is to be dedicated to the City of Atlanta or the connection of private streets to City of Atlanta right-of-way |
$1000 application, $10/lot |
each |
| Replat of residential property |
$40 first two lots, $20 each additional |
each |
| Replat of non-residential property |
$20 first two lots, $10 each additional |
each |
| ZONING FEES |
FEE |
UNIT |
| Zoning Non-Conforming Verification Letter with Inspection |
$300 |
each |
| Zoning Non-Conforming Verification Letter with without Inspection |
$100 |
|
| Zoning Verification for Business License |
$50 |
each |
| Zoning Verification Classification Letter |
$100 |
each |
| BUILDING PERMIT FEES |
FEE |
MIN FEE AMT |
| Building Permit ($7 per $1,000 of Cost of Construction) |
$7 Per $1000 |
$150 |
| Technology Fee (per permit) |
$25 |
- - |
| Permit Extension (each) |
$110 |
$110 |
| Change of Contractor/Record Change (each) |
$50 |
$50 |
| Refer toTable 100 of the Appendix B for more information on building valuation |
| ADDENDUM TO TABLE 100 (Building Valuation Date) |
FEE |
UNIT |
| One (1) & Two (2) Family Residence - Carport (detached or Attached) |
$35 |
per sq. ft. |
| One (1) & Two (2) Family Residence - Garage (Detached or Attached) |
$55 |
per sq. ft. |
| One (1) & Two (2) Family Residence - Unfinished Basement / Attic |
$55 |
per sq. ft. |
| One (1) & Two (2) Family Residence - Basement / Attic Finish-Build Out |
$46 |
per sq. ft. |
| One (1) & Two (2) Family Residence - Deck / Balcony / Porch / Screened Porch |
$35 |
per sq. ft. |
| MECHANICAL, ELECTRICAL & PLUMBING PERMIT FEES |
BASE FEE |
MIN FEE AMT |
| Mechanical Permit |
$150 |
$175 |
| Electrical Permit |
$150 |
$75 |
| Plumbing Permit |
$150 |
$175 |
| How Water Tank - (Remove and Replace (ONLY) for One- & Two-Family Residence |
$50 |
$175 |
| Temporary Power Permit |
$150 |
$175 |
| Gas Pressure Test |
$150 |
$175 |
| Public Utility Permit |
$50 |
$75 |
| Low Voltage Permit - There is a minimum Low Voltage fee $45 for the first 3,000 square feet and $1.50 for each additional 1,000 square feet |
$150 |
$175 |
| Additional fees for trade permits apply based on project scope. Reference Appendix B of the Municode for more details. |
| ***A $25 Technology fee is applied to each of the permit base fees. |
| CERTIFICATE OF OCCUPANCY |
FEE |
UNIT |
| One (1) & Two (2) Family Residence - Additions |
$50 |
each |
| One (1) & Two (2) Family Residence - New Construction |
$100 |
each |
| Commercial - Residential Condominium |
$10 |
per unit |
| New Commercial Building 1-7 Stories |
$200 |
per floor |
| New Commercial Building over 7 Stories |
$300 |
per floor |
| Commercial Interior Alterations |
$100 |
per suite |
| Certificate of Completion |
$100 |
per permit |
| Duplicate: Permit/Certificate of Occupancy |
$50 |
each |
| GENERAL FEES |
FEE |
UNIT |
| Technology Fee |
$25 |
per permit |
| New Tower |
$1,825 |
each |
| Co-Locate: Antenna, Dish, Radio Heads |
$100 |
each |
| Equipment Cabinet / Box, Ice Bridge |
$100 |
each |
| At Risk Fast Track Metal Stud Framing Only |
$200 |
valuation |
| Awnings / Canopies |
$35 |
per linear ft. |
| One (1) & Two (2) Family Online Permit: Remove & Replace Hot Water Tank |
$50 |
each |
| One (1) & Two (2) Family Residence-Roofing or Re-roofing |
$360 |
each |
| Demolition: One (1) & Two (2) Family Residence |
$650 |
each |
| Demolition: Commercial Buildings |
$1,860 |
each |
| Retaining Wall |
$220 |
each |
| Fences: 6 feet or less |
$75 |
each |
| Fences: Over 6 feet |
$120 |
each |
| New Parking Lots, Paving, Resurfacing, Concrete Walkways, and/or Driveways |
$200 |
each |
| One (1) & Two (2) Family Residence - Swimming Pool / Spa |
$240 |
each |
| Commercial Swimming Pool / Spa |
$1,750 |
each |
| FIRE LIFE SAFETY PERMIT FEES |
BASE FEE |
MIN FEE AMT |
| Fire Sprinkler Permit |
$150 |
$175 |
| Underground Fire Line |
$150 |
$175 |
| SIGN FEES |
FEE |
UNIT |
| Wall Signs |
$150 + $1.00 per square foot of sign area |
each |
| Freestanding Signs |
$450 + $1.00 per square foot of sign area |
each |
| Shopping Center Signs |
$450 + $1.00 per square foot of sign area |
each |
| General Advertising Sign |
$1,050 |
each |
| Portable Signs |
$75 |
each |