SECTION 104. - PERMITS
-
104.1. - APPLICATIONS.
(a)
Applications for permits shall be examined within a reasonable time after filing, provided however that no applicant shall be prevented from exercising their rights pursuant to O.C.G.A. § 8-2-26 to request in writing a determination as whether their application can be processed within the time frame set forth by such state law. If, after examination by the director, it appears that the proposed work will be in compliance with the laws and ordinances applicable thereto, the application shall be approved and a permit issued for the proposed work. If the director's examination reveals otherwise, or if the director finds that any ongoing construction subject to this Code and related to the building or structure for which the permit application has been filed does not comply with the applicable regulatory requirements, is subject to a notice or stop work order issued under Sections 106.1 or 106.2, the condition in violation has not been remedied or corrected, and the permit application is not necessary for such remedy or correction, such application shall be rejected and the applicant notified by a written report or otherwise.
(b)
A nonrefundable minimum initial permit application fee of $175.00 shall be imposed for all building permit applications accepted for review. Any failure of the form of the payment offered for permit application fee shall result in the immediate cancellation of the application. Twenty-five dollars of the nonrefundable minimum initial permit application fee shall be allocated to fund the cost of technology improvement and such payments may be allocated to pay the cost of improvements already undertaken.
(c)
For all permits requiring plan review, a portion of the total building permit fee shall be paid to cover the cost of plan review before any processing of the application shall occur. The applicant shall be responsible for providing accurate cost of construction information to the director in such form as the director shall specify.
(i)
All applicants shall pay 50% of the total building permit fee based on the cost of construction information provided to the director at the time of the submittal of the application for plan review. The director may decline to continue plan review upon a finding that the cost of construction information submitted was inaccurate and if such determination is made, the director shall notify the applicant within three business (3) days that such determination has been made and that payment of the amount necessary to bring the amount paid to 50% of the total building permit fee that plan review will recommence.
(ii)
Amendments or corrections to plans requiring a third review of the plans, and each subsequent plan amendment or correction may require the payment of an additional 25% of the estimated building permit fee or a fee of $150.00 per hour of plan review time whichever is smaller.
(iii)
Revisions or amendments to plans for which a building permit has been issued, but for which no certificate of occupancy has been issued may, require an additional plan review fee in the event of changes discovered upon inspection that were not a part of the plans approved for permit issuance.
(iv)
Within 30 days after the payment of the initial plan review fee (50% of the total building permit fee estimate), the applicant may present in writing a request that the building permit application be withdrawn. The Director may authorize a refund of up to 50% of the plan review fee payment, provided that the cost for the plan review ($150.00 per hour of review per department) does not exceed the amount of refund requested as of the date when the Office of Buildings received the refund request. The initial permit application fee is not refundable.
(d)
An application shall expire when there has been no activity on the application for a period of 180 days as described in this subsection.
(i)
With respect to an application not approved for issuance of the building permit, "no activity" shall mean that the applicant of record has not responded to the director's written notification that additional information or correction of any of the required plans is required before further processing of the application can take place or that the applicant has failed to submit corrections to plans or additional information after having received the director's written instructions. Such written notifications may be made by e-mail or by other means such as dated notations during plan reviews where the applicant or a representative is present.
(ii)
With respect to an application approved for issuance of the building permit, "no activity" shall mean that the applicant of record has not responded to the director's notification that all required approvals have been obtained and the building permit is awaiting issuance and that the final fee payment is due.
(iii)
An expired application shall not be vested against any change in the zoning code, or any applicable building code, or any other ordinance of the City of Atlanta.
(iv)
An expired application may be reactivated by the director, by the payment of the actual cost ($150.00 per hour) to review the plans for any change in the zoning code and any applicable building code but in no case shall this cost be less than $150.00. Reactivation of the application shall not excuse compliance with the provisions of the zoning code, or any applicable building code, or any other ordinance of the City of Atlanta in effect at the time of reactivation.
(v)
Any changes requested to an expired application shall require an additional 50% of the cost of the building permit to cover the cost of review by all affected departments.
(e)
An application shall be cancelled and shall not be reactivated after 365 days of no activity. For the purposes of determining when cancellation of the permit application shall occur, "no activity" shall have the same meaning which applies to the expiration of applications and begin as of the same date that the expiration period begins.
(f)
Extensions of permit applications.
(i)
Upon the request of applicant and payment of the fee required by this subsection prior to the expiration date or cancellation date of the permit application, it may be extended once as of right, for a period of up to 180 days. Any subsequent extensions of 180 days shall be at the discretion of the director, who may only grant further extensions upon a showing of extraordinary circumstances, and, payment of the fee prior to the date of expiration or expiration of the prior extension, provided however that no extension shall vest an application against changes in the zoning code or increases in building permit fee for any period greater than six months from the date when the permit would have first expired.
(ii)
The cost for all permit application extensions shall be $100.00. During the period of the extension, the time for the application to be considered a cancelled permit by the operation of law shall be tolled but the fact that the extension has been granted shall not act to prevent the imposition of additional cost for the reactivation of an expired permit application as set forth above.
(g)
Once the applicant has been contacted in the manner set forth in their application and been informed that all required approvals have been obtained and the building permit does not issue within 365 days of the date of such contact, the permit application shall be cancelled and may not be reactivated. Failure of the applicant to keep their contact information current by notifying the director in writing of the change in the contact information shall not extend the time before cancellation may occur.
(h)
The issuance or granting of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of any violation of any of the provisions of this Code. No permit presuming to give authority to violate or cancel the provisions of this Code shall be valid, except insofar as the work or use which it authorizes is lawful.
(i)
Nothing in this section shall be construed to prevent the building official from issuing a permit for the construction of a part of a building or structure before the entire plans and detailed statements of said building or structure have been submitted or approved. No permit issued pursuant to this section shall vest any rights in the applicant or permit holder in a manner that would excuse any failure to fully comply with all applicable requirements of the City Code prior to the issuance of the certificate of occupancy and all work that is done shall be fully at the risk of the permit holder.
(j)
Interior work on the build-out of commercial buildings is permitted prior to the final approval of building plans provided however that such work shall be limited to the use of metal stud members. Such work can only be performed by a licensed contractor and shall require the submission of plans and the payment of a $200.00 nonrefundable "fast-track metal stud only" additional application fee. Any licensed contractor applying for such application shall acknowledge at the time of initial permit application that the work is entirely at risk and that any work not in conformity with the code or the plans must be corrected. The issuance of "fast-track metal stud only" permit through the additional application fee shall not excuse compliance from any requirement of Code or of other ordinances of the City of Atlanta, Georgia prior to issuance of a regular permit.
(k)
The issuance of a permit based on applications, plans and/or specifications shall not prevent the director from thereafter requiring the correction of errors when in violation of this Code or of other ordinances of the City of Atlanta, Georgia.
(l)
Information provided by an applicant of record including all details shown on the plans submitted shall be presumed to be given to the City with the consent of the owner and shall be binding with respect to all actions taken by the City in reliance upon such information. The submission of the application shall be sufficient for this presumption to become effective and signature of the applicant or owner is not required for the information to be considered a representation binding on the applicant or owner that the information in the application is truthful.
(Ord. No. 2025-07(25-O-1055), § 1, 2-17-25)
-
104.2. - FEES.
Any persons obtaining a building permit shall pay, to the City of Atlanta, fees in accordance with the value of the proposed work per square foot of building in addition to any application fee charged in Section 104.1. For purposes of this section, the minimum value of proposed new work (including new work to existing structures) shall be based on Table 100, Building Valuation Data provided by the International Code Council as updated February 2009 and as set forth herein. Valuation of alteration projects shall be based upon the estimated construction costs for new work. Minimum value for interior alterations without engineered structural work shall be 20% of the valuation of new building construction. For interior alterations involving structural engineering, the minimum valuation shall be 40% of the value of new building construction. The factor shall apply only the square footage being altered in the application and not the entire structure.
(a)
Reserved.
(b)
The amount of $7.00 per $1,000.00 of valuation based on Table 100 is the fee for the plan review of the building permit. The final payment shall be the total of the valuation cost calculation less the plan review cost previously paid. The fact that the valuation cost calculation does not include the amount of development impact fees imposed pursuant to Chapter 19 or other fees imposed elsewhere in the Code does not relieve any applicant from the payment of any fees. No permit is valid until all fees imposed by the City have been paid and the payment validated by the Office of Revenue
(c)
A reinspection fee of $50.00 shall be imposed for each reinspection after the initial inspection when a written notice has been issued requiring the correction of inferior work.
(d)
A fee of double the usual permit fee will be charged for all building begun without a permit. However, in no case shall the penalty portion of said fee exceed $1,000.00. In the event that work is stopped for failure to obtain a permit and citations are issued for violation of the stop work order, any court imposed fines shall be for violation of the stop work order and every violation may constitute a separate offense.
(e)
The fee for changing the contractor of record on a permit or permit application shall be $50.00.
(f)
The fees for sign permits set forth in this section shall impose an additional amount to fees charged elsewhere in the City Code for sign permits where such fees are lower than the fees charged in this section such that the fee amount in this section shall be the actual amount of the fee.
(g)
A fee of double the usual permit fee shall be charged for signs erected without a permit. However, in no case shall the penalty portion of said fee exceed $1,000.00.
(h)
Fees for the issuance of certificates of occupancy (whether temporary or permanent which are each a separate fee) shall be as follows:
a.
New one- and two-family residences shall be $100.00.
b.
Additions to one- and two-family residence shall be $50.00.
c.
Tenant build-out for residential condominium units shall be $100.00 per unit.
d.
New commercial building of one story shall be $200.00.
e.
New commercial building exceeding one story but less than eight stories in height shall be $200.00 plus $200.00 per additional floor or portion thereof.
f.
Any building eight stories or higher shall be $300.00 per floor.
g.
Tenant build-out for interior commercial spaces shall be $100 per story or portion thereof.
h.
Condominium development (residential or commercial) common area and major systems (HVAC, gas, electrical, sprinklers, parking decks, and like components) shall be charged fees in the same manner as new commercial buildings.
i.
The fee for the reprinting of duplicate certificate permits or certificates of occupancy shall be $50.00.
j.
The fee for a certificate of completion shall be $100.00.
k.
Emergency call-out inspection shall be $300.00.
l.
Life Safety inspection shall be $200.00 per floor.
m.
Fire or water damage preliminary inspection shall be $200.00 per inspection.
(i)
A non-profit entity applying for a permit for the development of not for profit housing for the homeless may request an exemption from building permit fees. In such cases, the director shall investigate the application and decide whether the application meets the criteria set forth in this subsection. For purposes of this sub-section a non-profit development is that constructed by an entity recognized as non-profit under § 501(c)(3) of the Internal Revenue Code or an entity meeting the requirements of § 501(c)(3).
(j)
Development impact fees shall be imposed in accordance with Section 19-1001 et seq. of the City of Atlanta Code of Ordinances.
(k)
The fee for the registration of contractors pursuant to O.C.G.A. § 8-2-26 shall be $100.00 per year.
(l)
Fees for Additional Plan Review Services Requested by Applicant. By written request to the director, an applicant may receive additional services at a cost above the normal permit fees and which shall be performed by appointment outside of normal business hours at the discretion of the director, subject to availability of personnel and a written fee agreement concerning the following rates:
a.
Initial consultation and preliminary plan review (maximum of two hours).
b.
Expedited plan review. Requires initial consultation and payment at the listed hourly rate:
(m)
Miscellaneous permits - where a minimum permit fee is set forth, the rate of $7.00 per thousand dollars of the value of work shall be used to determine if the permit fee is to be above the minimum.
a.
Construction of new cellular communication tower or commercial telecommunication satellite dish: .....$1,825.00
b.
Co-location on existing towers .....
For each new collocated antenna or other wireless facility on an existing wireless support structure or new equipment box within an existing ground compound: .....$100 provided that all zoning, permitting, or other fee for review or inspection in the aggregate shall not exceed $500.
For each modification, meaning improvement, upgrade, expansion, or replacement of an existing antenna or other wireless facility on an existing wireless support structure or within an existing equipment: .....$100 provided that all zoning, permitting, or other fee for review or inspection in the aggregate shall not exceed $500.
c.
Awnings/Canopies—Per linear foot .....$35.00
d.
Single-family residential carport or accessory building—Per sq. ft. .....$0.25
e.
Single family residential garage or accessory building—Per sq. ft. .....$0.38
f.
Single-family residential basement or attic: .....
Unfinished—Per sq. ft. .....$0.38
Build-out—Per sq. ft. .....$0.33
g.
Decks/Balconies/Porches SF residential—Minimum fee .....$350.00
h.
Re-roofing of existing structures—Minimum fee .....$360.00
i.
Demolition of residential buildings—Minimum per bldg. .....$650.00
j.
Demolition of commercial buildings—Minimum per bldg. .....$1,860.00
k.
Retaining walls—Minimum fee .....$220.00
l.
Fences 6 ft. or less in height—Minimum fee .....$75.00
m.
Fences greater than 6 ft. in height—Minimum fee .....$120.00
n.
Paving or resurfacing—Minimum fee .....$200.00
o.
SF Residential swimming pools or spas—Minimum fee .....$240.00
p.
Commercial swimming pools or spas—Minimum fee .....$1,750.00
q.
Sprinkler (up to 50 heads) .....$150.00
(More than 50 heads add $1.00 per head)
r.
MEP permits—Minimum fee .....$150.00 except public utility re-connection fee which shall be $50.00.
Each additional trade .....$150.00
More than two plan reviews—Per review .....$150.00
s.
SF and Duplex Online "Remove & Replace" .....$50.00
Limited to: hot water tanks, dishwashers and similar appliances; kitchen cabinets; toilets, tubs, sinks and showers; interior or exterior painting only.
(n)
Fees for services provided by the Zoning Enforcement Division—Where a minimum permit fee is set forth, the rate of $150.00 per hour shall be used to determine if the permit fee is to be above the minimum.
a.
Verification of non-conformity where necessary for determination of application for building permit—Minimum fee of $300.00.
b.
Letters requesting verification of non-conformity—Minimum fee of $300.00.
c.
Letters requesting zoning verification without investigation of non-conformity—Minimum fee of $100.00.
d.
Verification of zoning for business license without investigation of non-conformity—Minimum fee of $50.00.
(o)
Fee for sign permits—Where a minimum permit fee is set forth and the cost above the minimum is not rated per square foot, the rate of $150.00 per hour shall be used to determine if the permit fee is to be assessed shall be above the minimum. The rating of fees in square feet is for the purpose of determining the charge for the installation of signs and does not determine whether a sign of a particular size will be allowed under the City of Atlanta Sign Ordinance. All permit fees are payable upon application and are nonrefundable.
a.
General advertising signs—New applications and conversions involving changing signs—Minimum fee $1,050.00.
b.
Wall signs—New applications and conversions involving changing signs—Minimum fee of $150.00 plus $1.00 per square foot of sign area. Where a second wall sign is reviewed as a part of the same application, only the $1.00 per square foot of sign area shall be charged for the second sign.
c.
Freestanding signs—New applications and conversions involving changing signs—Minimum fee of $450.00 plus $1.00 per square foot of sign area. Where a second freestanding sign is reviewed as a part of the same application, only the $1.00 per square foot of sign area shall be charged for the second sign.
d.
Shopping center signs shall be charged at the same rate as freestanding signs.
e.
Portable signs—$75.00.
(p)
Fee for sign permits—Where a minimum permit fee is set forth in Chapter 28A of the Zoning Code forth and the cost set for the herein would rise above that fee, the fees charged herein shall be in the nature of an additional fee.
TABLE 100 cost per sq. ft.
-
104.3. - REFUND OF PERMIT FEES.
Within six months from the date of issuance of a permit, a refund request of 50% of the permit fee paid to date, excluding the nonrefundable application fee, may be granted for the following:
(a)
When a permit has been issued in error as determined by the director provided no work has commenced on that permit.
(b)
When a permit has been issued and the job has been cancelled by the applicant, provided no work has commenced on that permit.
(c)
All applications for refunds shall be in writing and shall state the reasons for the request. However no refund shall be issued for less than $50.00.
-
104.3.1. - BUILDING PERMIT FEE REVIEW REQUESTS FOR COMPLETED PROJECTS.
(a)
Applicability. An applicant for a building permit, or the owner of the property which is the subject of the permit (collectively referred to herein as the "owner"), for a project meeting the eligibility requirements herein has the right to request a building permit fee review under the procedures set forth herein.
(b)
Eligibility. For a project to be eligible for building permit fee review, the director shall find:
(i)
The project required the submission of plans and the calculation of the building permit fee from such plans using Table 100;
(ii)
The Table 100 job cost calculation on which the city's building permit fee is based exceeds the actual cost to construct the building or structure which is the subject of the permit (the "project") by more than ten percent as indicated on the building permit application;
(iii)
The owner paid a plan review fee equal to one-half of the building permit fee based on the cost of construction information provided to the director at the time of the submittal of the application for plan review as required by Sec. 104.1(c);
(iv)
The owner paid a final building permit fee payment which is the balance of the fee based on the cost of construction information provided to the director at the time of the submittal of the application for plan review as required by Sec. 104.1(c); and
(v)
The owner gave written notice of the request for a permit fee review, as prescribed herein, at the time of final building permit fee payment.
(c)
Notice. The notice of a request for a permit fee review must contain, at a minimum:
(i)
The permit number;
(ii)
The street address of the project;
(iii)
The permit fee amount paid;
(iv)
The permit holder's approximate expected cost to construct that part of the project for which the review is sought;
(v)
A statement of demand for a permit fee review based on actual cost to construct a completed project including a statement of the amount of the difference (greater than 10%) between the projected permit fee based on Table 100 and the projected permit fee based on owner's expected cost;
(vi)
The name and street address for the person authorized to receive notices from the director. No post office box may be used to receive notice from the director; and
(vii)
A statement agreeing that the payment of a review fee associated with the director's review of the permit fee review request as established by city council will be paid before a final certificate of occupancy is issued.
(d)
Building permit issuance authorized during building permit fee review. If the director finds that an owner is eligible for a building permit fee review, the director may issue a building permit, notwithstanding the requirement of Sec. 104.2(b) that the final permit payment be based on Table 100. While the permit review request is being processed in accordance with the procedures outlined in this section, the director may also conduct all inspections during the course of construction, including final inspection, and issue a temporary certificate of occupancy upon completion of construction. The director shall not issue a final certificate of occupancy until the owner pays the amount set forth in Sec. 104.2(b) or the amount approved by the Atlanta City Council.
(e)
Required submittals for building permit fee review.
(i)
Within 30 days of the date of the issuance of the building permit, the owner shall submit:
(1)
An affidavit from a professional engineer or architect, registered in the State of Georgia swearing that the cost stated in the notice given to the director is expected to be the actual cost to construct the project and shall specifically identify and agree to produce the data on which this statement is based after the temporary certificate of occupancy is issued; and
(2)
An affidavit from the owner, the leaseholder or the person who is responsible for payment of the cost to construct the project, swearing that all forms of payment used to pay the total amount that will be paid to construct the project will be submitted as proof of payment of the job cost amount and further will agree to produce such documents after the temporary certificate of occupancy is issued in conjunction with the audit required by this section. The proof of payment is required to confirm that Table 100 job cost calculation on which the permit fee is based exceed the actual cost to complete the project.
(ii)
Within 90 days after issuance of the temporary certificate of occupancy, the owner shall submit an independent audit of the project (the "audit") prepared by a certified construction manager or a certified public accountant licensed to practice in the State of Georgia (collectively referred to herein as the "auditor") on behalf of the owner for the purpose of seeking a permit fee review from the city. The auditor's report shall make a certified finding as to whether the affidavits submitted by the architect or engineer and the owner of the property fairly represent the cost associated with the construction of the project and the amounts actually paid and state their opinion as to the amount by which the permit fee should be adjusted.
(iii)
A temporary certificate of occupancy issued for the purposes of a permit fee review request shall meet all requirements for the issuance of a final certificate of occupancy so that the most accurate cost to complete the project can be obtained.
(iv)
It shall not be sufficient for the purpose of the permit fee review request to identify contract documents as the only documents which shall form the basis for either affidavit or the permit fee review request and unless both affidavits contain an agreement to produce any document reasonably relevant to the project when requested by the director and to produce such documents upon the directors request, the director may deny the request;
(f)
Review by the director. The following review process shall be substantially followed:
(i)
In evaluating the audit, the director shall be entitled to receive any documentation relied upon by the auditor or such other documents as the director may reasonably deem relevant for review; provided however that such request shall be made by the director within 30 days of the audit. The director may but is not required to engage an auditor to review the submission of the owner. The failure to produce the requested documents to the director within 30 days without cause shall be grounds for the director to consider the request for permit fee review withdrawn.
(ii)
Within 60 days after the director has received all documents requested, the director shall notify the owner in writing of his intent to issue a written recommendation to the Atlanta City Council for either:
(1)
Approval of the amount of the permit fee based on actual costs as requested;
(2)
Approval of a different permit fee amount based on the actual cost to construct; or
(3)
Denial of the permit fee adjustment.
(iii)
The director shall base his recommendation on the findings of the Auditor's report, including any audit commissioned by the director, and all other available documentation establishing the actual cost of construction. The director's failure to make a finding within 60 days after the director has received all documents requested shall be considered a recommendation of denial of the permit fee adjustment as requested by the Owner unless the Owner provides its written consent to allow the director additional review time. Within a reasonable time after, the director shall cause the necessary legislation to be submitted to the Atlanta City Council, with a copy of the director's for a final decision on the permit fee adjustment request.
(g)
Decision by the Atlanta City Council. The Atlanta City Council shall, by ordinance, adopt as its final decision, the recommendation of the director unless there is an expressed finding by the council that the director's recommendation was based on an erroneous finding of a material fact, or that he acted in an arbitrary manner. In such a case, the Atlanta City Council shall:
(i)
approve of the amount of the permit fee based on actual costs as requested;
(ii)
approve a different permit fee amount based on the actual cost to construct; or
(iii)
deny of the permit fee adjustment.
(h)
Post-decision procedure. The following shall apply:
(i)
Upon the ordinance becoming law in the manner established in the Charter, the director shall so inform the owner in writing within three business days.
(ii)
If no appeal of the Atlanta City Council's decision is timely filed or the owner waives such appeal, and upon the owner's payment of any outstanding amounts consistent with the Atlanta City Council's decision and any other fee provision, the director shall be authorized to issue a final certificate of occupancy, if otherwise lawful.
(h)
Appeal. If the owner disputes the Atlanta City Council's decision, upon payment of the director's certified cost to conduct the review, the owner may appeal from such decision to the Superior Court of Fulton County by filing with the clerk of said court a petition in writing setting forth plainly, fully and distinctly wherein such decision is contrary to law. Such appeal shall be filed within 30 days after the decision of the city council is rendered. Upon such filing, the clerk of the superior court shall give immediate notice thereof to the director. Such appeal to superior court shall be served on the director as provided by law. Within the time prescribed by law, the director shall cause to be filed with said clerk a duly certified copy of the administrative record created in connection with the permit fee review request and such evidence on which his decision was based; provided however that the building plans for the project shall not be submitted as a part of the administrative record of the permit fee review request unless the specific plan sheets are identified by the owner and the owner agrees to pay the cost of copying the original plans to be submitted to the court. The process stated herein may also be used to appeal the Atlanta City Council's denial of a permit fee review request for failure to meet the deadlines required for the processing of the permit fee review request provided however that the appeal of the Atlanta City Council's denial of the permit fee review request for failure to meet any of the deadlines for submission of documents shall be filed within 30 days of the date of the written denial.
(i)
Miscellaneous provisions.
(i)
Other fees not applicable. This section shall only apply to building permit fee reviews for projects which required the submission of plans and the calculation of the amount of the permit fee using the data set forth in Table 100. No other fee review, including without limitation, impact fees, may be requested under this section and the director is not authorized to accept such requests. The director's refusal to accept a fee review request which did not require the submission of plans and the calculation of the amount of the permit fee using the data set forth in Table 100 shall not be subject to the appeal provisions of this section. This section is provided solely to allow the office of buildings to make a determination through the director whether the determination of the job cost valuations by the use of Table 100 has resulted in a fee amount that is consistent with the actual cost to construct a project and is not intended for any other purpose, including without limitation, the appeal of fees determined by other means.
(ii)
Abandonment of project or permit fee review request. With respect to any permit fee review request under an issued permit which is abandoned or withdrawn after work is begun but for which no temporary certificate of occupancy is issued or which has been revoked by the director prior to the issuance of the certificate of occupancy, the permit fee review request shall be deemed withdrawn and the owner is liable for any balances due on the permit fee in accordance with Table 100.
(iii)
Penalty for false statement. Any person who knowingly and willfully makes false statements in an affidavit used or attempted to be used to obtain a permit fee adjustment pursuant to this section may be prosecuted under the City Code or applicable state laws, including without limitation O.C.G.A. § 16-10-71, and punished in the manner provided for conviction of such violations.
(iv)
Time limit on temporary certificate of occupancy. The temporary certificate of occupancy issued during the pendency of a permit fee review request shall not remain in effect for more than 180 days after the owner presents the result of the Audit to the director unless an appeal of the Atlanta City Council's decision is filed, in which case the temporary certificate of occupancy shall remain in effect until the appeal is settled or a decision is rendered by the court with jurisdiction over the appeal. The failure to obtain a final certificate of occupancy shall be cause for the director to order the discontinuance of the occupancy of the structure.
-
104.4. - CONDITIONS FOR PERMIT.
(a)
All work performed under a permit shall conform to the approved application and plans, and approved amendments thereto, and all codes or ordinances governing the work or equipment for which the permit was issued. All work requiring a building permit shall be performed by an individual, contractor, firm or corporation holding a valid business license in the City of Atlanta for the operation of a building contracting business, unless said work is performed by a homeowner in a single family or duplex dwelling occupied by that individual.
(b)
One set of approved plans, specifications and computations shall be retained by the Director, and one set of approved plans and specifications shall be returned to the applicant, which shall be kept on such building or work at all times during which the work authorized thereby is in progress.
(c)
It shall be unlawful to reduce or diminish the area of a lot or plot on which a plot plan has been filed and has been used as the basis for a permit unless a revised plot plan showing the proposed change in conditions shall have been filed and approved; provided that this shall not apply when the lot is reduced by reason of a street opening or widening or other public improvement.
-
104.5. - EXPIRATION OF PERMITS.
A permit under which no work is commenced within six months after issuance, or where the work commenced is abandoned for six months, shall expire and fees paid shall be forfeited; provided however that for permits for the demolition of residential structures of four (4) units or less, the time shall expire after 60 days. The director may upon written request of the permit holder received in the Office of Building prior to the date that the permit would be deemed expired extend the time that the permit will be effective for a period not to exceed thirty (30) days and upon a showing of good cause for a period not to exceed ninety (90) days. The cost for a thirty (30) day permit extension shall be $110.00. The cost for a ninety (90) day permit extension shall be $220.00
(a)
The application, plans, and specifications connected with any expired permit shall again be reviewed and a new permit and application fee paid before abandoned work is started or resumed.
(b)
Upon expiration of the permit any right to have the application reviewed under the laws in effect at the time of submission of any earlier permit shall also expire.
(c)
The determination that the work has not been commenced or has been abandoned shall be made by the director and based on an inspection of the progress of the work undertaken at site since the last activity recorded by the City and such other factors as the director may deem relevant.
(d)
The period of time that an appeal which challenges the issuance of a stop work order for a violation of Chapter 16 or the validity of the permit alleging that the structure or use is not allowed by Chapter 16 is before the board of zoning adjustment or the appeal of the decision of the board of zoning adjustment shall toll the expiration of a permit until the decision of the board of zoning adjustment is final. This subsection shall not be construed to expand the jurisdiction of the board of zoning adjustment beyond that which is set forth in Chapter 6.
-
104.6. - REVOCATION OF PERMIT.
The Director may revoke a permit or approval, issued under the provisions of this Code in conformity with Section 106 in any case where there has been any false statement or misrepresentation as to a material fact in the application or plans on which the permit or approval was based, or whenever any work done under said permit violates the provisions of any Code applicable thereto or is done in violation of the approved plans or specifications on file in the Bureau of Buildings.
-
104.7. - POSTING OF PERMIT.
A copy of the permit shall be kept on the premises for public inspection during the prosecution of the work and until the completion of the same.
-
104.8. - CERTIFICATE OF OCCUPANCY.
(a)
New buildings. No building hereafter erected shall be occupied or used, in whole or in part, until a Certificate of Occupancy shall have been issued by the Director and posted on the premises certifying that such building conforms to the provisions of this Code and other laws and ordinances affecting the construction, maintenance, alteration, repairs and use of buildings and facilities. See also SCOPE.
(b)
Temporary Occupancy. Upon request of the holder of a permit, or of the owner, the Director may issue a Temporary Certificate of Occupancy for part of a building; provided that such temporary occupancy or use would not jeopardize life or property.
(c)
Buildings hereafter altered. No building hereafter enlarged or extended, or so altered, wholly or part, as to change its classification of occupancy, and no building hereafter altered for which a Certificate of Occupancy has not been heretofore issued, shall be occupied or used, in whole or in part, until a Certificate of Occupancy shall have been issued by the Director; provided that if the occupancy or use of such building was not discontinued during the work of alteration, the occupancy or use of the building shall not continue for more than 30 days after completion of the alteration unless such certificate shall have been issued.
(d)
Certificate of Occupancy. The Certificate of Occupancy shall state the purposes for which the building may be used in its several parts, the maximum permissible live loads on the several floors, the number of individual persons that may be accommodated in the several stories, in case such number is limited by a provision of law or by the permit, and all special stipulations of the permit, if any.
(e)
Issuance of certificate. A Certificate Occupancy shall be issued within 5 days after written application thereof, if the building at the time of such application shall be entitled thereto. Copies of Certificates of Occupancy shall be furnished, on request, to persons having a proprietary interest in the building.
(f)
Change of occupancy. No change of occupancy shall be made in a building hereafter erected or altered that is not consistent with the last issued Certificate of Occupancy for such building, unless a new certificate of occupancy is secured. No change of occupancy that would bring a building under some special provisions of this Code shall be made, unless the Director finds, upon inspection, that such building conforms substantially to the provisions of law with respect to the proposed new occupancy, and issues a Certificate of Occupancy therefor.
(g)
The occupancy of a building shall not be deemed to have changed because of a temporary vacancy or change of ownership or tenancy. The reestablishment in a building, after a change of occupancy has been made, of a prior use that would not have been permitted in a new building of the same type of construction, is prohibited. The change from a specifically prohibited use to another specifically prohibited use shall not be made.
(Ord. No. 1983-13, § 1, 3-11-83; Ord. No. 1983-14, § 1, 3-11-83; Ord. No. 1985-91, § 1, 12-19-85; Ord. No. 1989-84, § 1, 11-14-89; Ord. No. 1989-87, § 1, 11-28-89; Ord. No. 2013-30(13-O-1043), § 1(Att. B), 7-10-13)