Accessory Dwelling Units (ADUs) and Junior Accessory Dwelling Units (JADUs) are an innovative and effective option for adding housing in Stockton.

ADUs have been known by many names: granny flats, in-law units, backyard cottages, secondary units and more. Learn more about the definition of these types of housing units, what is required to build them, and what resources are available.

AB 1332 Pre-Approved ADU (Accessory Dwelling Unit) Plans & Information

This page contains information for City of Stockton pre-approved ADU plans which are intended to facilitate housing by helping to speed up the permit approval process and to reduce the normal cost associated with a new project plan review. Pre-approving and posting these plans are required by jurisdictions by California's AB 1332.

The plans listed here will require site-specific design and permitting approval as on all standard projects.

We provide links to city approved plans and plan designers here. The designers of the pre-approved ADU plans are not specially authorized or recommended by the City, we have just pre-approved their plans to the current code standards. The City also offers pre-approved ADU plans that are permit-ready.

ADUs still require obtaining the Planning Department approval to ensure they meet applicable zoning code regulations.

Pre-approved ADU plans are not an option for properties located in a FEMA Special Flood Hazard Area as shown on the current effective Flood Insurance Rate Map.

Please refer to the California Department of Housing & Community Development ADU Handbook for more information related to ADUs.

ADU Image 03

More Information about ADUs and JADUs
ADU Information

An Accessory Dwelling Unit (ADU) is an attached or detached residential dwelling unit on the same lot as an existing or proposed single-family dwelling that is zoned for single-family or multifamily use. ADUs provide independent living quarters for one household on the same lot as an existing or proposed single-family or multifamily dwelling, including areas for sleeping, eating, cooking, and sanitation. An ADU may be detached, attached or a converted structure located within the walls of the primary dwelling unit on the lot.

  • Detached: The ADU structure is detached from the primary dwelling unit.
  • Attached: The ADU structure is attached to the primary dwelling unit.
  • Converted: The ADU within the existing primary dwelling unit or the ADU was established through the conversion of an accessory structure, for example, a garage or pool house
  • Review Flyer for City of Stockton Pre-Approved ADU Plans
  • ADU Guide
JADU Information

A Junior Accessory Dwelling Unit (JADU) is no more than 500 square feet in size and contained/constructed entirely within the walls of an existing single-family structure. The property owner is required to reside in either the main dwelling or the JADU. This may include the conversion of an attached garage but detached accessory structures cannot be converted to JADUs. 

  • Efficiency kitchen required: Includes plug-in-type cooking appliances, adequate food prep counter, and refrigerated storage.
  • Sanitation Facilities: May be included in the JADU or may share with the main dwelling. Interior access to the main dwelling is required if sharing bathroom facilities.
  • A JADU is not allowed to be constructed in a multi-family building.
  • The property owner is required to reside in the main dwelling or the JADU, this requirement is documented on a recorded deed restriction.
Benefits of an ADU and JADU
  • These type of units can provide a source of income for homeowners; 
  • Allows homeowners the flexibility to create a home to share with family members
    and others;
  • Offers an opportunity for multi-generational living, allowing seniors to age in place as they require more care;
  • May provide affordable and additional housing opportunities within existing neighborhoods; and
  • A cost-effective way to provide additional housing, by potentially eliminating the cost of purchasing land, installing or building major new infrastructure, or creating new structured parking.
Permitting Process for ADUs and JADUs

The following documents have been created to assist in the preparation of a Building Permit submittal for an ADU or JADU. For custom design ADU/JADU projects, please refer to the Plan Review Submittal Checklist for a list of items required. If you would like to take advantage of the City’s Pre-Approved ADU program, please refer to the Pre-Approved Accessory Dwelling Unit Checklist and Sample Site Plan for further guidance.

Unpermitted ADUs

Assembly Bill 2533 (AB 2533) allows owners of unpermitted ADUs constructed before January 1, 2020, to obtain permits to permanently “legalize” their ADU, while only meeting the requirements of Health and Safety Code (H&SC) 17920.3. This code section requires buildings to meet sanitary, structural, electrical, plumbing, mechanical, weather protection, approved material, maintenance, exit, and fire health and safety requirements. This incorporates the majority of the requirements in the California Building Standards Code. Under this bill, local ADU ordinances and California Energy Code and CALGreen Code requirements are exempted. All conditions that deem a building substandard must be corrected as part of the permit process.

A checklist of conditions that would deem a building substandard under H&SC 17920.3 can be found in the Substandard Housing Inspection Checklist.

Before applying for a building permit, a homeowner may obtain a confidential third-party code inspection from a licensed contractor to determine the ADU’s existing condition or potential scope of building improvements using the checklist referenced above.

If you would like to permit and legalize your existing unpermitted ADU, follow the instructions under the Permitting Process for ADUs and JADUs section of this webpage.

Waiver of Fees

A homeowner applying for a permit for a previously unpermitted accessory dwelling unit or junior accessory dwelling unit constructed before January 1, 2020, shall not be required to pay impact fees or connection or capacity charges except when utility infrastructure is required to comply with Section 17920.3 of the Health and Safety Code.

Delay Enforcement

AB 2221. Until January 1, 2030, AB 2221 allows owners of unpermitted ADUs constructed before January 1, 2020 to request a 5-year delay of enforcement against the violation, so long as they do not endanger health and safety. ADUs constructed without permits inherently endanger health and safety, therefore even under this bill, owners must obtain permits to meet the California Residential, Mechanical, Electrical, Plumbing, and Fire Code requirements. Enforcement of California Energy Code and CALGreen Code may be delayed the 5-years, after which it would be required to meet all California Buildings Standards Codes.

HOMEOWNERS - How to get a pre-approved ADU

As a homeowner, you may choose to use one of the City’s own pre-approved ADU plans. The City offers a studio, a 1 bedroom, and 2 bedroom ADU options; see floor plans below. You will need to submit a completed permit application and a Site Plan drawn to scale showing setbacks and easements (Sample Site Plan). Fire sprinkler system will be required if the original house is sprinkled.

The second option that a homeowner may choose is one of the vendors’ preapproved ADU plans. The various vendors’ preapproved ADU floor plans are shown below with contact information on the floor plan. You will need to submit a completed permit application, a Site Plan drawn to scale showing setbacks and easements (Sample Site Plan), site-specific energy forms and vendor approval on a letterhead allowing the homeowner to use the pre-approved plans.  Fire sprinkler system will be required if the original house is sprinkled.

City Offered Pre-Approved Plans for ADUs:   Studio, 1 Bedroom, 2 Bedroom

Accessory Dwelling Unit (ADU) plans are available free of charge to community members looking to build an ADU within City limits. There are three different floor plans to choose from Studio, 1 Bedroom, and 2 Bedrooms - all with 1 Bath. All plans are pre-approved to meet the latest code requirements and utilize simple, cost-effective designs. To meet the latest energy code requirements, all plan options are electric power only (no gas service).

VENDORS - How to get your ADU plans pre-approved

Complete a building permit application with the required plans and submit the proposal in accordance with the procedures outlined in the electronic plan check guide. 

Each submittal will be routed to Building and Planning for review.

IMPORTANT: Each preapproval is only valid for the current code edition in effect at time of plan check approval. Each ADU master plan will need to be updated each time the City of Stockton adopts new building codes, building policies, or zoning regulation updates.

 ADU Master Plan Submittal Packages shall include the following:  

  1. Architectural plan set to include a title sheet, floor plan, elevations, sections details, utility plan sheet, and details.
  2. Structural plan set to include a foundation plan, roof/ceiling framing plan, braced/shear wall plan, and details.
  3. Structural Calculations, as applicable.
  4. Energy Code Compliance Specifications.
  5. Current CalGreen Checklist – Residential.
Vendor Pre-Approved ADU Floor Plans
There are currently not any vendor pre-approved plans. Any future pre-approved plans will be uploaded here.