Electrical Plan Review Checklist

Overview

  • Legend showing symbols used on drawings
  • Type, location, and size of all service equipment and meters
  • Show all wiring
  • Show all feeders and branch circuits
  • Show all overcurrent protection with interrupting rating
  • Provide narrative responding to each not met condition and to any other change to the plans. The changes must be indicated on drawings. All revisions must be clouded and numbered.
  • Show all grounding details
  • Show all low voltage
  • Show all communication systems
  • One line diagram with wire size and pipe size and panel directory
  • Show all communication systems
  • Show all emergency systems
  • Show all special occupancies
  • Show all equipment
  • Breaker number for everything electrical with size of wire and conduit size
  • Show all load calculations
  • Location, voltage, horsepower, current, of every motor
  • Required sign circuit for each commercial building and each commercial occupancy accessible to pedestrians
  • Show all wiring methods and materials
  • Show all ground-fault circuit-interrupter protection
  • All drawings need to be designed to Florida Building 2023 Energy Conservation Code 405
  • Electrical site plan required
  • Show NEC 2020 on plans

Most common reasons for disapproval

Residential

  • No approved plans on job
  • Work not ready for inspection
  • No access to property
  • Work outside scope of permit
  • Work covered up without inspections (walls, ceilings, underground)
  • 210.50 Missing required outlets.
  • 210.52 Spacing of receptacles.
  • 210.8 Not installing or improper wiring of GFCI receptacles
  • 300.4 Protection against physical damage (nail plates missing)
  • 422.30 Missing disconnecting means for appliances
  • 200.11 Reverse polarity of receptacles
  • 314.16 Boxes not sufficient size
  • 408.4 Missing circuit directory for panelboards
  • 440.6 Air-conditioning equipment (improper wire or overcurrent protection)
  • 110.12 (C) Electrical equipment contaminated by foreign materials paint, plaster, cleaners, etc.
  • 210.12 Need to install Arc-Fault Circuit-Interrupter Protection for all outlets in dwelling unit bedrooms

Commercial

  • No approved plans on job
  • Work not ready for inspection.
  • No access to property.
  • Work outside scope of permit.
  • Work covered up without inspections (walls, ceilings, underground).
  • 110.26 Not the required work space about electrical equipment
  • 250.66 Improper grounding electrode conductor
  • 250-122 Improper equipment grounding conductor
  • 314.28 Improper size for pull and junction boxes
  • 410.16 Luminaries not securely fastened to ceiling framing member
  • 90.7 Equipment not listed
  • 590.2(D) Temporary wiring not removed
  • 210.63 Missing receptacle for heating, air-conditioning and refrigeration equipment
  • 210.62 Missing show window receptacle
  • 700.12(F) Improper wiring of emergency lights