Residential Inspections: The Start-to-Finish Guide

Label: Information
Your project may need inspections at different stages—before, during, and after the work. This guide shows you exactly when to schedule inspections and what steps to take. We’ll walk you through the requirements and help you get ready so your inspections go smoothly.

The City of Portland requires residential inspections for one- and two-family homes. This includes duplexes and two-unit townhomes.

Your permit is not complete until an inspector approves the work.

Before you start work

  • Know your responsibilities
    • You, the permit holder,
      Permit holder

      The person who applied for the permit and has received the permit and approved plans from the City. The permit holder is legally responsible for all permitted work, required inspections, and overall project coordination.

      are legally responsible for all permitted work, required inspections, and overall project coordination.
    • Consider hiring a licensed contractor
      • If you're not familiar with construction codes or inspection requirements, a licensed contractor can help you avoid costly delays and mistakes.
    • Highly recommended: We're here to help with pre-construction Consultations.
       
  • Review your approved plans for special requirements
    • Check your permit documents for any of the following:

      • Tree preservation requirements
        • For projects that require tree preservation, a Root Protection Zone must be set up.
        • Before starting any ground-disturbing activities, get a Tree Preservation Inspection (507). 
           
      • Special inspections
        • Special inspections (e.g., structural, soils) are identified in your approved plan set. If you're unsure whether they apply to your project, stop and confirm before proceeding. Work performed without the required special inspection oversight may need to be removed and redone.
           
      • Deferred submittals
        • All deferred submittals
          Deferred submittal

          Portions of a building or structure design submitted after the original building permit.

          Learn more
          must be submitted and approved before continuing with the portion of work they affect. Proceeding without approval can result in failed inspections and delays.
           
      • Cesspool decommissioning
        • If your project site includes a cesspool or other private sewage disposal system, it must be properly decommissioned in accordance with Oregon DEQ regulations and City of Portland requirements.


       

  • Get the required trade permits
    Trade permit

    A permit for specialized work like plumbing, electrical, or mechanical systems. Each type of work needs its own trade permit and is usually issued separately from the building permit.

    (if you didn't get a combination permit
    Residential combination permit

    Also known as "combo permit". A permit package that includes the building permit and all the trade permits (electrical, mechanical, and plumbing). The benefit of a combo permit is that you only need one permit number to schedule inspections and pay rather than managing four separate permit numbers.

    Learn more
    )
    • If your project includes any of the following types of work, you must obtain separate trade permits:
    • Important for property owners:
      • If you own the property and plan to do the trade work yourself, you can get the required trade permits as a homeowner. This only applies if the building is not for sale, lease, or rent.
      • If you hire a subcontractor to do the work, they must get their own permits.
         
  • Keep approved plans on site
    • Plans must be available on site for all inspections throughout the project.
       
  • Do not cover work without an inspection
    • All permitted work must be inspected before it is covered by drywall, concrete, backfill, etc.
       
  • When in doubt, call for an inspection
    • It’s better to call than to risk delays or rework.

Need technical advice? Contact inspectors about residential permits.


Overview of scheduling inspections

Inspections must be requested in a specific order to ensure code compliance and prevent delays.

  • Schedule a pre-construction Consultation Inspection. This is an optional inspection, but it is highly recommended to avoid costly rework.

    We will review your approved plans and clarify all the required inspections you'll need to schedule.

    • The Consultation Inspection is included with your approved permit. There's no additional cost for this consultation.
    • Schedule before you start any work.
    • To schedule a consultation inspection, use the following codes to request a consultation by discipline:
      • 295 – Structural
      • 155 – Electrical
      • 397 – Plumbing
      • 650 – Mechanical
    • How it works:
      • An inspector will call you between 7:30 a.m. and 8:30 a.m. on the day of your scheduled consultation to determine whether your question can be resolved over the phone or if an on-site visit is needed.
      • Keep approved plans on site.
      • Important: Consultations do not count as approved inspections. All required inspections must still be scheduled and passed for the work to be approved.

     

  • You may schedule multiple inspections on the same day. We’ll assign them to the same inspector when possible.
     
  • Important: All rough trade inspections (electrical, plumbing, mechanical) must be approved before the 270 Framing inspection can occur.

Inspection sequences by project types

Applies to interior remodels, garage/attic/basement conversions, and changes of use.

Only schedule inspections relevant to the scope of work performed.

Find inspection details and when to schedule.

Typical inspections for alterations and conversions include:

  • 105 - Electrical Rough-In
  • 310 - Plumbing Rough-In / Top-Out
  • 620 - Mechanical Rough-In
  • 260 / 270 - Shear Wall / Framing (if structural changes occur)
  • 280 - Insulation
  • 199/399/699 - Trade Finals
  • 299 / 999 - Final Building / Final Permit

All permits need the “999 Final Permit” inspection. Your permit will not be approved and closed until you get this inspection. Without the “999 Final Permit” inspection, the permit is still “under inspection.” If a permit is without an approved inspection for more than 180 days, it will expire.

Get the full list of inspections.


When to schedule inspections

Protection must be in place and be approved before ANY other work takes place. 

Protected trees need a 6-foot chain-link fence around them as detailed in the approved plans.


Schedule an inspection

Schedule on DevHub or over the phone with our automated system.

  1. Sign into DevHub.
  2. Open the Inspections section.
  3. Select the Cancel button for the inspection, then confirm the cancellation. 

Today's scheduled residential inspections

Learn about today's residential inspections.


Inspection results

Your inspector will email you an inspection report. If the inspection is approved, great!

If the inspection failed, then your inspection report will list the corrections required to get approved.

There are many reasons why the work did not get approved:

  • No access - the inspector may not have been able to inspect the work
  • incomplete work
  • code violations

You will be responsible for making the corrections.

You can also get inspection results by searching for your permit on DevHub.


Re-inspections


Contact inspectors about residential permits

If you have questions after a previous inspection, find your inspector's contact information on your inspection results or PortlandMaps.

For technical code advice, contact the senior residential inspectors.

Senior Residential Inspectors
Sr. Building Inspector503-823-8471
Sr. Building Inspector/Expired Permits 503-823-8722
Sr. Electrical Inspector503-823-8481
Sr. Plumbing Inspector 503-823-8630

For help with Remote Video Re-inspection (RVR), call 503-865-8436.

For all other questions, call Office Support at 503-823-7388.

The inspectors' names and regions are listed on the 1 & 2-Family Residential Inspector District Map. Your inspector may be different than the one listed on the map.

Back to top