See something we could improve on this page? Give website feedback.
Research
What permits do you need?
You'll need a building permit and trade permits
A permit for specialized work like plumbing, electrical, or mechanical systems. Each type of work needs its own trade permit and is usually issued separately from the building permit.
You may want to consider getting the Residential Combination Permit
Also known as "combo permit". A permit package that includes the building permit and all the trade permits (electrical, mechanical, and plumbing). The benefit of a combo permit is that you only need one permit number to schedule inspections and pay rather than managing four separate permit numbers.
What to include with your permit application and how to apply will depend on your project.
For bathroom projects that change an existing space, you can get your permit through either the Simple Bathroom Program
A faster permit process for adding or legalizing a bathroom inside an existing home. No structural changes or exterior work allowed. Does not require drawings. Ideal for simple, interior-only projects that meet all eligibility criteria. The typical permitting process for bathroom projects. Requires building, plumbing, electrical, and mechanical permits, plus drawings and plan review. Needed if your project doesn’t qualify for the Simple Bathroom Program.
If your project qualifies, we recommend the Simple Bathroom Program option as a quicker and easier (and more affordable!) way for you to get your bathroom.
If you're increasing the size of your home to add a new bathroom, follow the permitting requirements for residential additions.
When you need a permit
You will likely need one or more permits if you are:
- Moving or adding plumbing fixtures (toilet, sink, shower, tub)
- Moving or adding electrical outlets, lights, or fans
- Changing walls or openings (adding/removing walls, changing door or window size)
- Installing or moving heating or ventilation systems
- Making structural changes (load-bearing framing)
When you don’t need a permit
You usually do not need a permit if you are:
- Painting or wallpapering
- Installing new cabinets or countertops without moving plumbing or electrical
- Replacing flooring
- Replacing plumbing fixtures in the same location, without altering plumbing, wiring, or structure
Types of permits you might need
Depending on the scope of work, you may need:
- Residential building permit (for structural or wall changes)
- Plumbing permit
- Electrical permit
- Mechanical permit (for ventilation or heating changes)
Note: If you need a building permit for an existing bathroom remodel, use the standard bathroom permit process. You cannot use the Simple Bathroom Program for this case.
Does your project qualify for the Simple Bathroom Program?
This program is available if all of the following are true of your project:
- It's a new full
Full bathroomor half bathroom
A bathroom with a toilet, sink, and a shower and/or bathtub.
Half bathroom, or you’re legalizingA bathroom with a toilet and sink, but no shower or bathtub.
Legalizean existing bathroom.To get a permit for work that was done without one, by showing it meets current code. This often requires inspections and may need changes to bring the work into compliance.
- You are NOT remodeling an existing bathroom. Get information on bathroom remodels.
- Work is interior only—no exterior alterations.
- No changes to load-bearing framing.
- The property can have no more than three toilets total, including the one in the new bathroom.
- The bathroom is in the primary residence, not a detached accessory structure.
Note: Additional conditions may apply. For example, you may not qualify if your property has an open code violation or a party sewer.
If your project does not qualify for the Simple Bathroom Program, use the standard bathroom permit. With the standard bathroom permit, you will need to provide site plans and structural plans.
This table compares the Simple Bathroom Program with the standard bathroom permit. Use it to decide which permit path fits your project.
| Feature | Simple Bathroom Program | Standard bathroom permit |
|---|---|---|
| Project type | New full or half bathroom, or legalizing an existing bathroom. NO remodels. | Any bathroom project that does not qualify for the Simple Bathroom Program |
| Project location | Interior only; no exterior alterations | May include exterior alterations |
| Structural changes | No changes to load-bearing framing | May include structural changes |
| Plumbing limit | No more than 3 toilets total on the property | No set limit |
| Building type | Primary residence only (not in accessory structures) | Any building type |
| Other restrictions | May not qualify if there’s a party sewer or open code violation | Fewer restrictions |
| Plans required | No plans required | Floor plan and structural plans required |
| How to apply | Combine forms into one PDF, title “Simple Bathroom Program Application,” and email to ppdsbp@portlandoregon.gov | Apply through DevHub and complete full plan review |
| Review process | No formal plan review; City inspectors will check for code compliance. | Full plan review with possible checksheets |
| Permits needed | Building permit plus trade permits (plumbing, electrical, mechanical) as needed | Building permit plus trade permits (plumbing, electrical, mechanical) as needed |
| Pre-construction meeting | Required. After fees are paid, schedule a 295 - Structural Consultation Inspection. | Not needed |
